My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01656
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01656
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:00 PM
Creation date
10/4/2006 6:59:56 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/1/1985
Description
Meeting Notes & Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Lochhead seconded the nomination. Mr. Smith moved. seconded by . <br />Mr. Getches. that the nominations be closed and the Board cast <br />a unanimous ballot for Mr. Robbins. Motion adopted unanimously. <br /> <br />Mr. Robbins assumed the Chair and called for nominations <br />for Vice Chairman. <br /> <br />Mr. Lochhead nominated Mr. Smith. Mr. Johnston seconded i <br />the nomination. Mr.. Smith nominated Mr. Lochhead. Mr. <br />Johnston seconded the nomination. Mr. Smith requested that his <br />name be withdrawn. In the abs~nce of additional nominations <br />for Vice Chairman. Chairman Robbins declared that Mr. Lochhead <br />had been elected as Vice Chairman. <br /> <br />Aqenda Item 4 - Approval of Minutes. May 3. 1985. Meetinq <br /> <br />Mr. Johnston moved. second~d by Mr. Smith. that the draft <br />minutes of the May 3. 1985. BO&rd meeting be approved subject <br />to editorial corrections as de~med appropriate. Motion adopted <br />unanimously. <br /> <br />Aqenda Item 5 - Director!s Report <br /> <br />, . <br /> <br />1., Status of construction on Federal projects. Dallas <br />Creek. Dolores and Closed 13asin., ,In response to a request <br />by Mr. McDonald concerning the Dolores Project. Mr. John <br />Porter. manager of the Dolores Water Conservancy District. <br />announced that the District had assumed responsibility for <br />operation and maintenance_~f the project facilities. <br />effective May 1. 1985. <br /> <br />. <br /> <br />L' I <br />2. Colorado River Salinit~ Control Program. <br /> <br />, <br />3. - Lower Gunnison Winter neplacement Water. <br /> <br />4. Pending legislation in Congress as related to the <br />Anifuas~La Plata and Narrow~ Projects. <br /> <br />,. <br /> <br />5. Status of Construction on South Platte Channelization <br />Project (report by David Walker).. <br /> <br />6. Status of Long Bill - signefr by Governor (included <br />restoration of construction fund monies transferred to <br />General Funds in -1983). <br /> <br />7. State Legislation,- HOUse Bills 1042 and 1088. <br /> <br />8. Wild and Scenic River Study - Cache la'poudre River <br />(released by U.S. Department of Agriculture). <br /> <br />I <br />9. Flood Hazard Mitigation Plan (copiea distributed to <br />Board members). <br /> <br />. <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.