Laserfiche WebLink
<br />.. . <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />, <br /> <br />DRAFT Memorandum <br /> <br />To: <br /> <br />Wayne Schieldt, Assistant Division Engineer, Division 4 <br />Steve Tuck, Water Commissioner, Water District 40 <br />Dave Kanzer, Colorado River Water Conservation District <br />Don Meyer, Colorado River Water Conservation District <br />Jeff Crane, North Fork Improvement Association <br /> <br />From: <br /> <br />Kelly DiNatale, COM <br />EriiJ Wilson, LRE <br /> <br />Date: <br /> <br />May 6, 2005 <br /> <br />Subject: April 25, 2005 - Meeting Notes and Draft Work Plan <br />Gunnison Instream Flow Issues Meeting <br />Grand Junction, Colorado <br /> <br />The following are meeting notes from the April 25 meeting on the Gunnison in stream flow <br />issues. This memo also includes a draft work plan with a timeline designed to allow CWCB <br />to file applications for in stream flow rights in 2005. This work plan has not been reyiewed or <br />agreed to by any of the meeting participants or CWCB staff, but is intended to act as a plan <br />for discussion among the interested parties. <br /> <br />In attendance were: <br /> <br />Wayne Schieldt, Assistant Division Engineer, Diyision 4 <br />Steye Tuck, Water Commissioner, Water District 40 <br />Daye Kanzer, Colorado River Water Conservation District <br />Don Meyer, Colorado River Water Conservation District <br />Jeff Crane, North Fork Improyement Association <br />Erin Wilson, LRE <br />Kelly DiNatale, CDM <br />Randy Seaholm, CWCB (observing for latter part of the meeting while waiting for Aspinall <br />Operations meeting to begin) <br />Michelle Garrison, CWCB (observing for latter part of the meeting while waiting for Aspinall <br />Operations meeting to begin) <br /> <br />C:\MARK\NEW_RECS\2005ISF DOCUMENTS\CONTESTED CASES\N FOLK ISF MEETING NOTES_5-6..Q51.DOC <br />