My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01578
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01578
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:03:25 PM
Creation date
10/4/2006 6:58:06 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/15/2005
Description
CF Section - Construction Fund and Severance Tax Trust Fund Perpetual Base Account New Loans - Highland Ditch Company - Foothills Reservoir Rehabilitation Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Highland Ditch Company <br />November 8, 2005 <br />Page 2 of 4 <br /> <br />Agenda Item 23a <br /> <br />to take whatever measures are necessary to maintain and operate the reservoir without <br />interference by the fishing club. <br /> <br />Feasibility Study <br /> <br />The feasibility study was prepared by Duane Smith of Smith Geotechnical of Fort Collins on behalf <br />of the Company. The study was prepared in accordance with the CWCB guidelines and includes <br />preliminary engineering design and cost estimates. The project has been approved by SED for <br />construction. <br /> <br />The Hiahland Ditch Company <br /> <br />The Company is a mutual ditch company registered in the State of Colorado. The Company was <br />incorporated in 1872 and has been in continuous existence and operation since its inception. The <br />first water deliveries were from direct flow rights from the Saint Vrain River at the turn of the century <br />and shortly thereafter the Company began construction of several storage reservoirs. The <br />Company's reservoirs total approximately 12,800 AF of storage capacity and are located in Boulder <br />and Weld County. <br /> <br />The system also includes approximately 26 miles of supply ditch and approximately 15 miles of <br />extension and lateral ditches. The Company owns direct flow rights from the Saint Vrain River and <br />also owns 40 units of CBT water. The average annual delivery amount of water by the Company <br />from 1995 to 2004 is 32,552 AF. <br /> <br />Water Riahts <br /> <br />The Company's decreed water right for Foothills Reservoir has an appropriation date of July 13, <br />1910, Priority No. 11, Third Series, for 4,340 acre-feet of water to a decreed gage height of 45 feet. <br />A conditional refill decree was issued with a date of December 31,1929, with an appropriation <br />number of 23S, Third Series. This decree was later canceled by the District Court in 1965 due to <br />lack of evidence showing diligence. Foothills Reservoir is utilized to store water from the Saint Vrain <br />River during the spring runoff. The reservoir is filled through a supply canal by an exchange in the <br />river system to allow the Company to withdraw water at its main diversion structure near Lyons. <br /> <br />Proiect Description <br /> <br />Based on the results of extensive geotechnical investigation and a drilling and sampling program, <br />the Company has decided to repair the dam by cutting off seepage in the upper portion of the dam. <br />Three alternatives were evaluated to determine the most feasible method to accomplish this goal: <br /> <br />ALTERNATIVE 1 - Clay Core Trench $600,000 <br />Includes excavating a core trench into the center of the dam to a depth up to 35 feet below the dam <br />crest. This alternative will cutoff the seepage in the zone it pierces and will also add considerable <br />stability to the dam by removing and replacing the poorly compacted shale found in the dam. <br /> <br />ALTERNATIVE 2 - Bentonite Slurry Trench $758,355 <br />This alternative considered excavating a cutoff trench through the dam to bedrock using bentonite <br />slurry trench methods. The trench would be placed near the centerline of the dam and would be <br />approximately 18-inches in width. The slurry trench would develop a low permeability barrier to <br />seepage but would not significantly increase the sliding stability of the dam. The uncompacted <br />shale layers in the dam would not be impacted or modified by this construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.