Laserfiche WebLink
<br />~ <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Highland Ditch Company <br />November 8, 2005 <br />Page 2 of 4 <br /> <br />Agenda Item 23a <br /> <br />to take whatever measures are necessary to maintain and operate the reservoir without <br />interference by the fishing club. <br /> <br />Feasibility Study <br /> <br />The feasibility study was prepared by Duane Smith of Smith Geotechnical of Fort Collins on behalf <br />of the Company. The study was prepared in accordance with the CWCB guidelines and includes <br />preliminary engineering design and cost estimates. The project has been approved by SED for <br />construction. <br /> <br />The Hiahland Ditch Company <br /> <br />The Company is a mutual ditch company registered in the State of Colorado. The Company was <br />incorporated in 1872 and has been in continuous existence and operation since its inception. The <br />first water deliveries were from direct flow rights from the Saint Vrain River at the turn of the century <br />and shortly thereafter the Company began construction of several storage reservoirs. The <br />Company's reservoirs total approximately 12,800 AF of storage capacity and are located in Boulder <br />and Weld County. <br /> <br />The system also includes approximately 26 miles of supply ditch and approximately 15 miles of <br />extension and lateral ditches. The Company owns direct flow rights from the Saint Vrain River and <br />also owns 40 units of CBT water. The average annual delivery amount of water by the Company <br />from 1995 to 2004 is 32,552 AF. <br /> <br />Water Riahts <br /> <br />The Company's decreed water right for Foothills Reservoir has an appropriation date of July 13, <br />1910, Priority No. 11, Third Series, for 4,340 acre-feet of water to a decreed gage height of 45 feet. <br />A conditional refill decree was issued with a date of December 31,1929, with an appropriation <br />number of 23S, Third Series. This decree was later canceled by the District Court in 1965 due to <br />lack of evidence showing diligence. Foothills Reservoir is utilized to store water from the Saint Vrain <br />River during the spring runoff. The reservoir is filled through a supply canal by an exchange in the <br />river system to allow the Company to withdraw water at its main diversion structure near Lyons. <br /> <br />Proiect Description <br /> <br />Based on the results of extensive geotechnical investigation and a drilling and sampling program, <br />the Company has decided to repair the dam by cutting off seepage in the upper portion of the dam. <br />Three alternatives were evaluated to determine the most feasible method to accomplish this goal: <br /> <br />ALTERNATIVE 1 - Clay Core Trench $600,000 <br />Includes excavating a core trench into the center of the dam to a depth up to 35 feet below the dam <br />crest. This alternative will cutoff the seepage in the zone it pierces and will also add considerable <br />stability to the dam by removing and replacing the poorly compacted shale found in the dam. <br /> <br />ALTERNATIVE 2 - Bentonite Slurry Trench $758,355 <br />This alternative considered excavating a cutoff trench through the dam to bedrock using bentonite <br />slurry trench methods. The trench would be placed near the centerline of the dam and would be <br />approximately 18-inches in width. The slurry trench would develop a low permeability barrier to <br />seepage but would not significantly increase the sliding stability of the dam. The uncompacted <br />shale layers in the dam would not be impacted or modified by this construction. <br />