My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01574
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01574
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:03:24 PM
Creation date
10/4/2006 6:58:03 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/11/1981
Description
CWCB Meeting
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3. Crystal <br /> <br />A. There is a constant flow through the reservoir <br /> <br />D. Navajo 6052.6 ft. 1.253 MAF (73.3% capacity) <br /> <br />A. March - July inflow - .275 MAF (35% of average) <br /> <br />E. WPRS Reservoirs in western Colorado are near their long- <br />term averages <br /> <br />Reservoir <br /> <br />Current <br />Active Capacity <br /> <br />Percent <br />Full <br /> <br />Taylor Park <br />paonia <br />Crawford <br />Fruitgrowers <br />Vega <br />Rifle Gap <br /> <br />51,250 A.F. <br />5,300 A.F. <br />8,100 A.F. <br />4,100 A.F. <br />10 ,000 A. F . <br />8,600 A.F. <br /> <br />48 <br />29 <br />58 <br />92 <br />30 <br />70 <br /> <br />II. Construction <br /> <br />A. Dallas Creek Project <br /> <br />1. Funding <br /> <br />FY 81 <br />FY 82 <br /> <br />$6,200,000 <br />$6,976,000 (Proposed Reagan Budget) <br /> <br />2. Road relocation is complete <br /> <br />Stage I Dam construction activities are 50% complete; <br />are scheduled for completion November 81. <br /> <br />Stage II contract to be awarded October 81 <br /> <br />3. Sponsoring agency: <br /> <br />Tri-County Water Conservancy District <br /> <br />Main purpose: <br /> <br />M&I, irrigation, recreation, F&W, and flood control <br /> <br />Major project feature is Ridgeway Dam and Reservoir <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.