My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01559
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01559
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:03:10 PM
Creation date
10/4/2006 6:57:40 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
2/17/1989
Description
Meeting Notes & Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />e. Repayment of the costs of the Colorado River Basin <br />salinity control program <br /> <br />f. Water project development assistance <br /> <br />g. Cumulative environmental mitigation of the CRSP <br /> <br />Annual O. M. & R Component <br /> <br />1. This component would be limited to the true annual O. M. & <br />R costs of Reclamation and Western for operation of CRSP power <br />generation and transmission facilities. <br /> <br />2. This component would be adjusted annually according to <br />pre-defined established procedures. <br /> <br />Power Allocation Components <br /> <br />1. These two components would cover the repayment with <br />interest of costs allocable. as per the 1956 CRSP Act. to <br />hydropower purposes. <br /> <br />2. Power customers would have the option of accelerated or <br />deferred repayment schedules so long as repayment was made <br />within the time period permitted by the 1956 CRSP Act. <br /> <br />Irriqation Assistance Component <br /> <br />1. This component would cover the repayment without interest <br />of costs allocable. per the 1956 CRSP Act. to irrigation <br />purposes which are beyond the irrigators' ability to repay. <br />Costs to be repaid would include the allocable costs of all <br />CRSP storage units and participating projects funded by <br />Congressional appropriations pursuant to the 1956 CRSP Act. <br /> <br />2. This component of the rate would be set without regard to <br />the percentage apportionment of power revenues among the states <br />which is set forth in the 1956 CRSP Act. <br /> <br />3. Power customers would have the option of accelerated or <br />deferred repayment schedules so long as repayment was made <br />within the time period permitted by the 1956 CRSP Act. <br /> <br />Salinity Control Component <br /> <br />1. This component of the rate would be set per the <br />requirements of the Colorado River Basin Salinity Control Act. <br />as amended. It would therefore vary over time as a function of <br />continuing federal investments in salinity control units. <br />including units authorized in the future. <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.