My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 03/03/1983
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
Board Meeting 03/03/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:03:07 PM
Creation date
10/4/2006 6:57:37 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/3/1983
Description
CWCB Meeting
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />MEMORANDUM <br /> <br />-2- <br /> <br />March 2, 1983 <br /> <br />The staff is of the opinion that only phase A, as identified <br />above, should be initiated at this time. There are major <br />questions which need to be explored concerning the frequency, <br />magnitude, and duration of flows which would be available for <br />diversion. This would include an analysis of the effects of the <br />Narrows project and of flood releases therefrom. The Bureau of <br />Reclamation is in the process of developing operating criteria <br />for the Narrows Reservoir, so it will be timely to take these <br />considerations into account. <br /> <br />A critical problem for this project will be the sizing of <br />diversion and conveyance facilities to handle relatively infre- <br />quent, high volume, short duration flows. This will ultimately <br />govern the availability of water for the project. With a thor- <br />ough analysis of the hydrology in hand, the staff anticipates <br />that one may be able to gain significant insights on the techni- <br />cal and financial feasibility of the project using the very rough <br />design and cost estimates that are already available in the just <br />completed reconnaissance study. This is why we recommend that <br />only phase A be initiated at this time. <br /> <br />The consultant has estimated that phase A will cost $45,000. <br /> <br />Recommendation <br /> <br />I recommend that the Board enter into a contract with Trans- <br />County Water, Inc., for the preparation of Phase A of the feasi- <br />bility study with one-half, but not more than $22,500, of the <br />cost to be provided by the Board from the construction fund, said <br />amount: (1) to be considered a part of the project's total cost <br />if the project is subsequently constructed with monies provided <br />by the Board, or (2) to become repayable at a service charge of 5 <br />percent within 10 years after construction on the project, or any <br />portion thereof, commences if the project is subsequently <br />constructed without monies provided by the Board. <br /> <br />bb <br />
The URL can be used to link to this page
Your browser does not support the video tag.