Laserfiche WebLink
<br />, <br /> <br />" <br /> <br />gl <br /> <br />3. The District shall, prior to commencing construction of <br />the project, obtain such public access to the reservoir <br />as the Board deems appropriate. <br /> <br />4. Prior to commencing construction on the project, the <br />District shall obtain from the owner(s) of any lands <br />adjacent to the reservoir pOol (at maximum water surface <br />elevation) the right to receive any appreciation in the <br />value of such lands which is attributable to the <br />construction and existence of the reservoir if and when <br />those lands or any portion thereof are sold by the <br />owner(s). In turn, the District shall contract with the <br />Board to convey to the Board any monies which it might <br />receive as a result of this requirement, said monies to <br />,be in addition to the repayments required by item 1 <br />above. <br /> <br />-5- <br />