My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01548
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01548
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:03:04 PM
Creation date
10/4/2006 6:57:27 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/25/2005
Description
Proposed Revisions to the Rules and Regulations for Dam Safety and Dam Construction
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br />-6 - <br />5,000 - 8,000 ft MSL .75 (.8 PMP) .50 (.8 PMP) <br />Above 8,000 ft MSL .75 (.7 PMP) .50 (.7 PMP) <br />Local Storm <br />10,000-11,500 ftMSL .75 (.8PMP) .50 (.8 PMP) <br />11,501 - 13,000 ft MSL .75 (.7 PMP) .50 (.7 PMP) <br />Above 13,000 ft MSL .75 (.6PMP) .50 (.6 PMP) <br />SmaIl - General Storm East <br />6,000 - 12,000 ft MSL .75 (.8 PMP) .50 (.8 PMP) <br />Above 12,000 ft MSL .75 (.7 PMP) .50 (.7 PMP) <br />General Storm West <br />5,000 - 8,000 ft MSL .75 (.8 PMP) .50 (.8 PMP) <br />Above 8,000 ft MSL .75 (.7 PMP) .50 (.7 PMP) <br />Local Storm <br />10,000 - 11,500 ft MSL .75 (.8 PMP) .50 (.8 PMP) <br />11,501 - 13,000 ft MSL .75 (.7 PMP) .50 (.7 PMP) <br />Above 13,000 ft MSL .75 (.6 PMP) .50 (.6 PMP) <br />Minor - General Storm East <br />6,000 - 12,000 ft MSL .50 (.8 PMP) <br />Above 12,000 ft MSL .50 (.7 PMP) <br />General Storm West <br />5,000 - 8,000 ft MSL .50 (.8 PMP) <br />Above 8,000 ft MSL .50 (.7 PMP) <br />Local Storm <br />10,000 - 11,500 ft MSL .50 (.8 PMP) <br />11,501 - 13,000 ft MSL .50 (.7 PMP) <br />Above 13,000 ft MSL .50 (.6 PMP) <br /> <br />. <br /> <br />. <br /> <br />The IDF shaH be determined considering basin size, the altitude of the basin, various soil <br />permeability, the various vegetative covers, and other factors related to the routing of the <br />storm event. <br /> <br />IV. Specific Proiect Status <br /> <br />North Sterling Reservoir <br /> <br />North sterling Reservoir, Located near Sterling Colorado is a Large High Hazard dam, the <br />Sate Engineer identified the inadequacy of the current spillway in 1982. Several extensions <br />for compliance with the Dam Safety Rules have occurred in an effort to identify reasonable <br />solutions to the lack of spillway capacity. These efforts have included suggested revisions to <br />the 2004 flood hydrology report, a 10% reduction in the HMR PMP used to develop the <br />Inflow Design Flood (IDF). These adjustments applied to a hydrology study, the preliminary <br />results indicate a reduction of about 25% of the inflow design flood. This translates to a . <br />potential reduction of approximately 400 ft (from 1640 ft to 1260 ft) in spillway width and <br />reduces the additional spiIIway needed to protect the dam from 1000 ft to 629ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.