My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01548
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01548
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:03:04 PM
Creation date
10/4/2006 6:57:27 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/25/2005
Description
Proposed Revisions to the Rules and Regulations for Dam Safety and Dam Construction
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />'~ <br /> <br />- 5 - <br /> <br />. <br /> <br />11,501 -13,000 ft MSL <br />Above 13,000 ft MSL <br /> <br />.7PMP <br />.6PMP <br /> <br />.50 (.7 PMP) <br />.50 (.6 PMP) <br /> <br />Minor - General Storm East <br />6,000 - 12,000 ft MSL <br />Above 12,000 ft MSL <br />General Storm West <br />5,000 - 8,000 ft MSL <br />Above 8,000 ft MSL <br />Local Storm <br />lQ,OOO -11,500 ft MSL <br />11,501 - 13,000 ft MSL <br />Above 13,000 ft MSL <br /> <br />.50 (.8 PMP) <br />.50 (.7 PMP) <br /> <br />.50 (.8 PMP) <br />.50 (.7 PMP) <br /> <br />.50 (.8 PMP) <br />.50 (.7 PMP) <br />.50 (.6 PMP) <br /> <br />The IDF shalI be determined eonsidering basin size, the altitude of the basin, various soil <br />permeability, the various vegetative covers, and other factors related to the routing of the storm <br />event. <br /> <br />Existine: Dams <br />. INFLOW DESIGN FLOOD REQUIREMENTS <br /> (Without Adjustment for Elevation) <br />Hazard Class Hil!h Sil!nificant Low NPH <br />Dam Size <br />Large .75 (.9 PMP) .50 (.9 PMP) 100 YR 50YR <br />SmalI .75 (.9 PMP) .50 (.9 PMP) 100 YR 25YR <br />Minor .50 (.9 PMP) 100 YR 50YR 25YR <br /> <br />The HMR PMP used to determine the IDF may be reduced based on the average elevation of <br />the drainage basin. The total PMP for determination ofthe IDF for drainage basins above 5, <br />000 (ft) MSL is in accordance with the folIowing: <br /> <br />INFLOW DESIGN FLOOD REQUIREMENTS FOR EXISTING DAMS <br />REDUCED FOR ELEVATION <br /> <br /> Hazard Classification Hil!h Sil!nificant <br /> Dam Size <br />. Large - General Storm East <br /> 6,000 - 12,000 ft MSL .75 (.8 PMP) .50 (.8 PMP) . <br /> Above 12,000 ft MSL .75 (.7 PMP) .50 (.7 PMP) <br /> General Storm West <br />
The URL can be used to link to this page
Your browser does not support the video tag.