Laserfiche WebLink
<br />classification. Ifthe classification has changed, then the provisions of these Rules and <br />specifically Rule 5 apply. <br /> <br />6.1.4. I Whenever the methods of Rule 5 apply, the minimum requirements for <br />determining the spillway capacity are summarized in the following table, but may be <br />reduced for good cause shown. Spillways designed in accordance with these Rules <br />will not be required to be enlarged due to subsequent revisions in PMP estimates, <br />unless, in the opinion of the State Engineer, a substantial increased threat to public <br />safety exists. <br /> <br /> INFLOW DESIGN FLOOD REQUIREMENTS <br />Hazard Class Hil!h Sil!nificant Low NPH <br />Dam Size <br />Large .75 (.9PMP) .50 (.9PMP) 100 YR 50YR <br />Small .75 (.9PMP) .50 (.9PMP) 100 YR 25YR <br />Minor .50 (.9PMP) 100 YR 50YR 25YR <br /> <br />INFLOW DESIGN FLOOD REQUIREMENTS FOR EXISTING DAMS <br />REDUCED FOR ELEVATION <br /> <br />Hazard Classification Hil!b Sil!nificant <br />Dam Size <br />Large - General Storm East <br />6,000 - 12,000 ft MSL .75 (.8 PMP) .50 (.8 PMP) <br />Above 12,000 ft MSL .75 (.7 PMP) .50 (.7 PMP) <br />General Storm West <br />5,000 - 8,000 ft MSL .75 (.8 PMP) .50 (.8 PMP) <br />Above 8,000 ft MSL .75 (.7 PMP) .50 (.7 PMP) <br />Local Storm <br />10,000 - 11,500 ft MSL .75 (.8 PMP) .50 (.8 PMP) <br />11,501 - 13,000 ft MSL .75 (.7 PMP) .50 (.7 PMP) <br />Above 13,000 ft MSL .75 (.6 PMP) .50 (.6 PMP) <br />Small- General Storm East <br />6,000 - 12,000 ft MSL .75 (.8 PMP) .50 (.8 PMP) <br />Above 12,000 ft MSL .75 (.7 PMP) .50 (.7 PMP) <br />General Storm West <br />5,000 - 8,000 ft MSL .75 (.8 PMP) .50 (.8 PMP) <br />Above 8,000 ft MSL .75 (.7 PMP) .50 (.7 PMP) <br /> <br />26 <br />