My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01519
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01519
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:02:45 PM
Creation date
10/4/2006 6:56:51 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/19/2003
Description
Draft Summary Minutes and Record of Decisions - March 24-26, 2003
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-7- <br /> <br />. <br /> <br />Board further recommended that the Cloud Seeding project would be given a <br />higher priority ranking and allocated a $25,000 budget. <br /> <br />The motion was approved 9-0, Greg Walcher was not present. <br /> <br />23. Statewide Water Supply Initiative (SWSI) Implementation and Update <br />Tape 3, Track 1 3:34:093:54:00 <br />Action: A motion was made by Keith Catlin with a second by Bob Burr that the staff <br />continue to finalize the Scope of Work and begin contract negotiations, The <br />motion was approved 8-0, Harold Miskel abstained. Greg Walcher was not <br />present. <br /> <br />24. <br /> <br />Water Snpply Planning and Finance - Construction Fund and Severance Tax Trust <br />Fund Perpetual Base Account New Loans <br />Tape 3, Track 1 3:54:00 - 3:56:00 <br />a. Silt Water Conservancy District - Pump Plant Transformer Replacement <br />Action: A motion was made by Carolyn MacIntosh and with a second by David Smith <br />to approve the staff recommendation to provide a Small Project loan from the <br />Construction Fund in an amount of $486,000 to the Silt Water Conservancy <br />District and/or the Silt Water Conservancy District Water Activity Enterprise <br />for up to 90% of the costs to replace the transformer and complete related <br />construction work at its pumping plant on the Colorado River. The <br />recommended term of the loan is 30 years and the lending rate is 2,75% <br />(2.828% Annual Percentage Rate). Security for the loan will be a pledge of <br />assessment revenues backed by assessment covenant, in accordance with <br />CWCB Loan Policy #5 (Collateral). An addition to the staff recommendation <br />was made to add' 'by and through' the Silt Water Conservancy District', <br /> <br />. <br /> <br />The Board further recommends that final approval of the loan be conditioned <br />upon all standard contracting provisions of the CWCB, including the 1 % loan <br />origination fee charged in accordance with ewCB Policy #16. The maximum <br />loan amount may be increased to $490,860, if the borrower elects to finance <br />the 1 % loan service charge. <br /> <br />The motion was approved 9-0. Greg Walcher was not present. <br /> <br />. <br /> <br />b. Stieb Brothers, Inc, - Well Augmentation Project <br />Tape 3, Track 1 4:26:00 - 4:34:00 <br />Action: A motion was made by Carolyn McIntosh with a second by Keith Catlin to <br />approve the staff recommendation to provide a Small Project Loan not to <br />exceed $151,500 to the Stieb Brothers, Inc. from the Construction Fund to <br />construct a system of wells and recharge ponds to replace out-of-priority <br />irrigation well depletions. The recommended term of the loan is 20 years and <br />the recommended lending rate is 2.5% per year. Security for the loan will be <br />Stieb Brothers, Inc, agricultural real estate with a total collateral of$151,500. <br />The real estate value will be supported by documentation from a Colorado <br /> <br />Colorado Water Conservation Board <br />Flood Protection. Water Project Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.