Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />~ <br /> <br />the top priorities according to the "Statewide Stream Rehabilitation and Floodplain Management <br />Needs Assessment". <br /> <br />Total Project Cost: $150,000 <br /> <br />CWCB Requested Amount: $150,000 <br /> <br />Project Name: Floodplain Mapping <br /> <br />Project Description: The CWCB has received requests from EI Paso and Weld Counties for <br />assistance with securing detailed topographic mapping for the delineations of 100-year floodplain a <br />maps. For EI Paso County, the study basin is Black Squirrel Creek and for Weld County the study <br />area is St. Vrain Creek. Both basiIis are under extreme development pressure. The CWCB funds <br />will be used as seed money that will be matched by County funds for contracting with a federal <br />agency. The Natural Resources Conservation Service (NRCS) will perform the engineering for <br />Black Squirrel Creek basin and the Corps Of Engineers will perform the engineering for St. Vrain <br />Creek. <br /> <br />Total Project Cost: $30,000 ($20,000 for Black Squirrel Creek, $10,000 for St. Vrain Creek) <br /> <br />CWCB Requested Amount: $30,000 <br /> <br />Table 1 <br />Summary of Projects and Costs <br /> <br /> <br />1-25 Corridor Master Drainage Plan - SW Weld County <br />Roaring Fork Multi-Objective Planning Project <br />CWCB Internet Flood Page and Flood Task Force <br />Statewide Drainage and FP Management Criteria Manual <br /> <br />Total <br /> <br />L:\wctrans\BoardmemVan99\11a severamce tax projects.doc <br /> <br />3 <br /> <br />.. ."" <br />;);'!::;:;i~';;i;[~m: <br />,'Pi? j~~f' <br />Cost($) <br />94,900 <br />70,000 <br />10,000 <br />150,000 <br /> <br />314,900 <br /> <br />::~~";:Kl~a:~~ed . <br />:"'::::;:~@~j~g <br />Amount ($)' <br />13,500 <br />20,000 <br />1 0,000 <br />150,000 <br /> <br />193,500 <br />