Laserfiche WebLink
<br />, <br /> <br />Tasks: <br /> <br />6 A 1. Review the results of the survey and all related meetings and reports. <br /> <br />. <br /> <br />6 A 2. Host and facilitate a plan task force process. <br /> <br />6 A 3. Draft components of a plan based upon the experience of the entire proj ect. <br /> <br />6 A 4. Facilitate a review by the advisory group and ~ponsors <br /> <br />6 A 5. Draft a final document, and deliver the same. , <br /> <br />IV. Additional Considerations: <br /> <br />IV 1. The proj ect will be under the direction of the Colorado Water Conservation Board <br /> <br />IV 2. All State of Colorado contracting procedures will be applicable in the selection of <br /> <br />and contracting with the consultant. <br /> <br />e <br /> <br />IV 3. The bid must include the qualifications and experience of the principals. <br /> <br /> <br />IV 4. The biq shall include the descriptions of at least two (2) survey and database development <br /> <br /> <br />projects which the contractor has successfully completed. <br /> <br />8Decific Considerations for the selection of the consultant for this project will include: <br /> <br />IV 5. Intimate knowledge of the physical and political circumstances of the State of <br /> <br />12 <br /> <br />e <br />