Laserfiche WebLink
<br />i <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />~ <br /> <br />STATE OF COLOMDO <br /> <br />Q <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866.3441 <br />FAX: (303) 866.4474 <br />www.cwcb.state.co.u5 <br /> <br />MEMORANDUM <br /> <br />Bill Owens <br />Governor <br />Greg E. Walcher <br />Executive Director <br />Rod Kuharich <br />eWeB Director <br />Dan McAuliffe <br />Deputy Director <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />John Van Sciver, P.E. .:::JVS <br />Mike Serlet, P.E., Chief Ill' ( <br />Water Supply Planning ~inance Section. <br /> <br />FROM: <br /> <br />DATE: November 5,2001 <br /> <br />SUBJECT: Agenda Item 21a., November 19-20, 2001 Board Meeting <br />Parker Water and Sanitation District <br /> <br />Introduction <br />The Parker Water and Sanitation District (PWSD) is applying for a $15 million loan from the <br />Construction Fund to construct the Rueter-Hess Reservoir Project. The estimated total cost of the <br />project, including all related infrastructure costs, is $103 million. Please see the attached project <br />summary and map. <br /> <br />Backaround <br />The PWSD, located in Douglas County, plans to construct the Rueter Hess Project as a central <br />management tool for replenishing and increasing the longevity of the District's water resources. <br />The reservoir will provide terminal storage for surface and ground water and for reclaimed <br />wastewater for use within the District's existing 8,596-acre service area, and for expected <br />expansion of the service area. The Reservoir will be located about 3 miles southwest of downtown <br />Parker on Newlin Gulch, and will be filled by a variety of sources, including in priority Cherry Creek <br />and Newlin Gulch flows, ground water, and effluent from advanced wastewater treatment (AWT). <br />The dam, scheduled to start construction in 2003, would be a Class 1 structure, 135 feet high, <br />impounding a reservoir of 16,200 ac-ft. <br /> <br />The PWSD plans to incrementally accumulate funds for the project over the next 5 years through <br />additional financing. <br /> <br />Enaineer and Feasibilitv Studies <br />GEl Consultants, Robert J. Huzjak, P.E. completed Preliminary Design of the Proposed Rueter- <br />Hess Dam, dated April 21, 2000. The Rueter-Hess Reservoir Feasibility Study was completed <br />August 2001 by the PWSD with input from their consultants. The study includes an evaluation of - <br />the alternatives that were considered for increasing the longevity of the District's water resources. <br /> <br />The Parker Water and Sanitation District <br />The PWSD is a Title 32 Special District as defined by the State of Colorado, providing water <br />and sanitary sewer service to customers within it's service area. The PWSD currently serves a <br />population of 23,248, providing 9,299 water taps and 8,848 sewer taps. The PWSD has the <br />power to set water and sewer rates paid by its customers, and the power to cut off water and <br />sewer service to customers that fail to pay monthly billings. <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and lake Protection <br />Water Supply Protection. Conservation Planning <br />