My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01480
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:02:20 PM
Creation date
10/4/2006 6:56:19 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/10/1998
Description
WSP Section - Colorado River Basin Issues - Adaptive Management Work Group
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />: <br /> <br />~ . The long-term frequency of BHBF' s is about I in 6 years. \Vhen [he reservoir is at the target <br />storage of 21.5 MAP on January 1. the frequency is about I in 3. <br /> <br />5 - The subgroup report contains a provision that encourages W AP A to make fluctuating <br />powerplant releases up to the GCDEIS ROD constraint of a maximum of 25.000 cfs and a <br />fluctuation limit of 8.000 cfs per day. It also recommends investigation of larger fluctuation <br />limits (e.g. 10,000 cfs per day), powerplant fluctuations above 25.000 cfs, and larger BHBF <br />releases (e.g. 60,000 cfs or larger). <br /> <br />. I"' <br />. I; <br /> <br />. <br /> <br />'I <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.