My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01410
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:01:27 PM
Creation date
10/4/2006 6:54:41 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/16/2004
Description
CF Section - Orchard City Irrigation District
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Orchard City Irrigation District <br />March 16-17, 2004 <br /> <br />Agenda Item 25g <br /> <br />The Orchard City Irriaation District <br />The OCID is a Colorado Irrigation District formed in accordance with CRS 37-41-101. There are _ <br />403 shareholders ("acre holders"), and 2,730 bonded acres within the District. The OCID has ,., <br />the power to set annual assessments to be paid directly by the shareholders, or collected <br />through the county tax collection process. District shareholders have voted to proceed with the <br />CWCB loan. The District is not subject to TABOR. <br /> <br />Water Riahts of the OCID <br /> <br />Table 1: Water Rights Summary <br /> <br />Armronriation Date Amount Comment <br />9/28/1907 3,400 AF Fruit Growers Reservoir, first fillino <br />1/31/1964 3,960 AF Fruit Growers Reservoir, refill riaht <br />2/10/1930 25 CFS Transfer Ditch riaht for first fillinc <br />5/28/1937 35 CFS Transfer Ditch richt for second fillinc <br />1/31/1964 20 CFS Gunnison River DumD station Inat currentlv used) <br /> <br />Total average annual diversions through the Transfer Ditch are 2,000 acre-feet. <br /> <br />Proiect Description <br /> <br />The following altematives were evaluated: _ <br />1. The no-action alternative, ,., <br />2, Rehabilitate only the worst 600 feet of the Dry Creek Transfer Ditch ($83,200,) <br />3, Rehabilitate 920 feet of the Dry Creek Transfer Ditch, and the Circle Ditch HG ($102,457.) <br /> <br />Alternative No, 1 was considered unacceptable since it means the District could not deliver its <br />full water right for storage in the Fruit Growers Reservoir. <br />Alternative NO.2 was ruled out because it was not a permanent solution to the problem, <br />Alternative NO.3 was selected since it is considered to be the least costly reliable approach, <br /> <br />The selected alternative, Alternative No.3, involves rehabilitation of 920 feet of the Transfer <br />Ditch by placing it in a 48" ADS plastic pipeline. Two concrete vault structures will be <br />constructed at comer points, and a concrete transition structure will be constructed to connect <br />to an existing upstream metal pipe, A culvert under the county road will be replaced with the <br />new pipeline, and a 4-foot parshall flume installed into an existing concrete chute structure, The <br />U.S, Bureau of Reclamation will pay for installation of an automatic water level measuring <br />devise adjacent to the parshall flume, The Circle Ditch headgate, located in the dam, will be <br />rehabilitated by installing a stainless steel replacement gate. <br /> <br />The NRCS has completed engineering designs for the project. <br /> <br />The project is currently under construction, with completion scheduled for March 2004. <br /> <br />e <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.