My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01371
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01371
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:01:03 PM
Creation date
10/4/2006 6:54:10 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/22/2003
Description
Flood Section - Colorado Floodplain and Stormwater Criteria Manual Presentation
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-2- <br /> <br />Volume I - Floodplain and Stonnwater ManagemejJ.t <br />Executive Summary <br />Acknowledgements <br />Table of Contents <br />Chapter I - General Provisions <br />Chapter 2 - CWCB Policies i <br />Chapter 3 - Floodplain and Stonnwater Management <br />Chapter 4 - Permit Requirements ' <br />Chapter 5 - Report Submittal Requirements <br />Chapter 6 - Flood Preparation Activities and Hazatd Mitigation <br />Chapter 7 - Information Resources and Networks ; <br /> <br />e <br /> <br />Volume n - Floodplain and Stonnwater Engineeri*g <br />Overview ' <br />Tables of Contents <br />Chapter 8 - Mapping Standards and Modemizatio~ <br />Chapter 9 - Hydrologic Analysis I <br />Chapter 10 - Hydraulic Analysis <br />Chapter 11 - Floodplain Delineation <br />Chapter 12 - Unique Hydraulic Conditions <br />Chapter 13 - Design of Hydraulic Structures <br />Chapter 14 - Stonn Sewer Systems <br />Chapter 15 - Storm Drainage Water Quality <br />Chapter 16 - References <br /> <br />e <br /> <br />Project Administration , <br />The project is directed by the Board staff with tec~cal reviews provided through a Technical <br />Advisory Committee (Committee). The Committee has a makeup of nine (9) representatives from <br />local, state, and federal government agencies and professionals with expertise on the subject matter <br />, <br />in the manual. The Project is scheduled for compl~tion on March 31, 2004. <br />! <br />eweR Presentation ! <br />, <br />Staffwill discuss with the Board the overall intent lof the manual and a procedure/framework for the <br />presentation of the proposed action items in Chapt~r 2 - CWCB Policies. <br /> <br />This chapter will contain CWCB policy statement~ on the recommended practices for: floodplain <br />mapping, floodway, stonnwater, conveyance systeins, detention, irrigation impacts, basin surface <br />water hydrology, and other flood protection related items. Also, CWCB policies dealing with <br />potential discrepancies between this manual and o~er state agency manuals and standards will be <br />provided and defined. The contractor will provide! an assessment of related issues regarding the <br />Board's existing Rules and Regulation for floodplllin designations and make revision <br />recommendations. ' <br /> <br />Action a <br />No action will be requested at the September CWqB meeting. Staffwill advise the Board on the ., <br />subject matter/topics that will be presented in Chapter 2 following a project review meeting with the <br />committee on September 17, 2003. i <br />, <br />Flood Protection. Water Project P1anninglandFinance. Stream and Lake Protection <br />Water Supply Protection" ConseIVation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.