Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Modeling of Reservoir Management Strategies <br />for Lakes Powell and Mead <br /> <br />Figure .t.22 <br />I)fobahilit)'" ur I.ake ~Iead E:J{'\'ation BrIo\\" 1000 <br /> <br />""". <br /> <br />___NctmaI.S,lepSl-oorlage",., <br />--f+,tt'>d~.S1~S>'o'tage,...., <br />_Hyllnd","'.Sl",,~nl'\I' <br />l-~re..r.!.Sl""srataoo_' <br />_~!'f!\03_Slep~r....' <br />! 70% <br /> <br />"" , <br /> <br />"" <br /> <br />.!-----= <br /> <br />I"" <br />! <br /> <br />~, <br /> <br />.. <br />~ <br />:0 40'>\. <br />. <br />~ <br /> <br />~, <br /> <br />"'" + <br /> <br />10% - -+ <br /> <br />'" <br />'''''' <br /> <br />.~ <br />"''' <br /> <br />"''' <br /> <br />2015 <br />C,l@nda,Year <br /> <br />"'''' <br /> <br />Figure 4-22 shows the probability of Lake ~1cad going below 1000 tt. Because Lake Powell releases <br />7.48 for an extended elevation range. Hyhrid rev2 and rev3 introduce a chance of going below 1000 It <br />one year carlier Lhan Hybrid Original and rev\. For this same reason, under Hybrid rc\'2 and rev3 the <br />probability is higher compared to the Nannal for all years after 2015. <br /> <br />4.3.3 Summary of Findings <br />The plots presented show that both Lakes Powell and Mead arc more sensitive to incrcas1I1g the <br />elevation range .It which Lake PO\\'ell releases 7A8 MAF than increasing the l.ake Mead balancing <br />elevation.. This is the same finding that resulted from the Hybrid Step Shortage Original sensitivity <br />analysis. presented in Section 4.1. Increasing the Lake Mead elevation to trigger a shortage so that <br />balancing releases from Lake Powell do not occur before a Lower Basin shortage does not change the <br />relative effects of the parameter adjustments made to fonn the Hybrid revisions. As shO\\'n in Section <br />4.2. the effect of increasing the shortage trigger elevation from 1075 n to 1100 n is higher 10th <br />percentile elevations at Lakes Powell and ~kad. <br /> <br />4.4 Extending the Interim Surplus Guidelines (ISG) <br /> <br />In addition to the sensitivity analyses for the Hybrid and Step Shortage strategies. two other sensitivity <br />analyses were perfomled that revealed significant findings. The first analysis involved extending the <br />Interim Surplus Guidelines from 2016 through 2025. with all other parameters remaining unchanged. <br /> <br />lake Powell was operated according to the Hybrid Original strategy. Lake i\.lcad's shortage strategy \vas <br />Step Shortage Original. <br /> <br />" <br />., <br /> <br />Working. Draft. \'ersion 1. January. 2006 <br />