Laserfiche WebLink
<br />..JUL.L. <br /> <br />MR. BERTHELSON: <br /> <br />MR. SPARKS: <br /> <br />part of the intertie. This intertie will pr'Oduce <br />revenues in excess 'Of its cast, if the same charge <br />f'Or the services is cantinued ta be made. The <br />intertie will nat produce nearly as much revenue <br />as Hualapai." <br /> <br />I <br /> <br />"How much?" <br /> <br />"It produces samething araund $200 milli'On <br />whereas Hualapai would have produced in excess <br />of $500 million. <br /> <br />As a further substitute, which is not in- <br />cluded in the Senate bill, the Department 'Of <br />Interior has been making some studies t'O deter- <br />mine whether 'Or not 'Other p'Ower features could <br />be c'Onstructed below H'Oover Dam, such as pump <br />back starage fr'Om Lake Mojave, Havasu 'Or same of <br />the existing works down there. I understand they <br />have came up with some pramising results ta throw <br />other features in here which would further augment <br />the fund. Let me say that the fund as n'Ow <br />planned by the Senate bill would am'Ount to an <br />accumulation by the year 2050 'Of $1,200,000,000, <br />as contrasted ta the 'Original bill with Hualapai <br />and Marble which wauld have pr'Oduced approxi- <br />mately $2 billion. To date there has been a <br />decrease in the prajected revenues, surplus <br />revenues, of $800 million by the elimination <br />of beth Hualapai and Marble Canyen Dams. <br /> <br />The central Ariz'Ona Pr'Oject requires a <br />cansiderable amaunt 'Of power and energy t'O <br />operate and Hualapai was ta be the primary <br />s'Ource 'Of energy for that project. Se some <br />substitute far pawer, purely far pumping pur- <br />poses, had ta be found. The Senate prop'Osed <br />that the Secretary enter into an agreement with <br />nenfederal entities ta prepay a part 'Of the <br />capacity in their systems. This is a novel <br />arrangement, but yau will recall that the actual <br />cest ta the federal g'Overnment 'Of Hualapai and <br />Bridge Canyon was in excess of $500 million. <br />By this arrangement that is now proposed by the <br /> <br />1 <br />