My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01321
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01321
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:00:18 PM
Creation date
10/4/2006 6:53:18 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/7/1961
Description
Minutes and Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />MR. STAPLETON: <br /> <br />MR. Me CANDLESS: <br /> <br />MR. SPARKS: <br /> <br />report that Colorado had quite a number. It <br />couldn't have caught us at a better time with <br />the Savery-Pot Hook, the Bostwick Park, the <br />Fruitland Mesa and the Fryingpan-Arkansas, <br />some $225,000,000 worth of projects. <br /> <br />I might state, that just looking over the <br />list here, the projects we have now under <br />active consideration, construction or in the <br />final stages of feasibility or definite plan <br />reports, we have projects which exceed in <br />cost considerably in excess of a half billion <br />dollars. And we have every reason to believe <br />that that half billion dollar program, about <br />$150,000,000 worth which is now under construc- <br />tion, will be a reality within the next ten <br />or twelve years. So you can understand, with <br />projects of that magnitude, some of the number <br />of problems, both small and large, that will <br />occur as a result. <br /> <br />I <br /> <br />We have a film, a recent film and an <br />excellent one, produced by Region 4 of the <br />Bureau of Reclamation on the Colorado River <br />Storage Project. It's about 20 minutes in <br />length. " <br /> <br />"Gentlemen, I don't want to cut short any <br />comments on the Director's report but we <br />always lose half our audience after lunch and <br />especially now that we have completed all of <br />the agenda items. If it is satisfactory to <br />the members of the Board, let us set up the <br />picture and have the meeting concluded before <br />lunch. The Board will meet for luncheon at <br />the Argonaut at 12:15." <br /> <br />"Mr. Chairman, I don't <br />you but just one question. <br />Larry why Juniper isn't on <br /> <br />want to interrupt <br />I'd like to ask <br />there?" <br /> <br />1 <br /> <br />"The reconnaissance study on the Juniper <br />has been completed. A decision will now have <br />to be made, based on reconnaissance studies, <br />where we are going with the Juniper from here. <br />We simply are not in a position this year to <br />
The URL can be used to link to this page
Your browser does not support the video tag.