My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01283
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01283
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:59:42 PM
Creation date
10/4/2006 6:52:33 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/24/2001
Description
Flood Section - Added Agenda Item: Drought Planning Survey Carryover Assessment Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />e <br /> <br />e <br /> <br /> <br />e <br /> <br />State of Colorado contracting procedures will be applicable in the selection of and contracting with the <br />contractor. The bid must include the qualifications and experience of the contractor, The bid shall include <br />the descriptions of previous survey and database development projects that the contractor has successfully <br />completed, If you have any questions regarding this project, please contact Maggie Van Cleefin writing at <br />the address above, phone: (303) 866-4188, facsimile: (303) 866-5575, <br />email:magf;ie.vancleef(a)state.co.us. <br /> <br /> <br />VIII. Consultant Selection Process <br />Pursuant to Sections 24-30-1408, CRS, notice is hereby given that the Colorado Water Conservation <br />Board (CWCB) may retain contracted professional services for the Drought Planning Survey/Carry-over <br />Storage Assessment Project. The CWCB is required by statute to conduct a consultant selection process, <br />The selection process will include the following steps: <br />I, Request proposals from interested firms, teams or parties, <br />2, Evaluate and rank the submitted proposals based on criteria listed below, <br />3, Conduct interviews with the top three (3) ranked firms, <br />4, Rank the firms or teams based on the proposals and interviews, <br />5, Enter scope of work and contract negotiations with the highest ranked firm team or party, If a <br />satisfactory contract cannot be negotiated, enter scope of work and contact negotiations <br />sequentially with the second and third ranked firm, team, or party, <br />Consideration of the contractor for this project will include the following criteria: <br />. intimate knowledge of the physical and political circumstances ofthe State of Colorado with relation <br />to water and drought issues; <br />. extensive knowledge and experience with the hazard of drought; <br />. the ability to construct interactive databases and Internet websites; <br />· experience in survey methodology and implementation; and <br />· no predetermined judgments or recommendations concerning the project. <br /> <br />9 <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.