My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 12/02/1982
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
Board Meeting 12/02/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:59:26 PM
Creation date
10/4/2006 6:52:02 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
12/2/1982
Description
CWCB Meeting
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />125 feet and maximum flow of 1,755 cfs. tt is <br />estimated that average annual power generation would <br />be 145 million kWh. <br /> <br />o Relocation of ten miles of railroad; The relocation <br /> <br /> <br />woulo start about one mile east of DeBeque and join <br /> <br /> <br />the existing line at a point about 0.7 miles west of <br /> <br /> <br />Parachute. The relocation would include a 2,800-foot <br /> <br /> <br />tunnel. <br /> <br />o Minor relocations, including about 4.3 miles of <br /> <br /> <br />existing secondary roads and 2 miles of a 230-kV <br /> <br /> <br />transmission line. At the upper end of the reservoir, <br /> <br /> <br />in the town of Parachute and in the Battlement Mesa <br /> <br /> <br />Development, ten apartment buildings and a number of <br /> <br /> <br />municipal facilities would have to be purchased and/or <br /> <br /> <br />relocated. <br /> <br />PROJECT COST <br /> <br />The total capital cost, expressed in January 1982, price <br />levels unadjusted for inflation during construction and the costs <br />of financing, was estima.ted to be $181.,588,000. Estimates of the <br />total investment cost of the project, based on an assumed June <br />1991, on-line date and eight percent annual inflation, were <br />illustrated by assuming that financing would be provided either <br /> <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.