Laserfiche WebLink
<br />125 feet and maximum flow of 1,755 cfs. tt is <br />estimated that average annual power generation would <br />be 145 million kWh. <br /> <br />o Relocation of ten miles of railroad; The relocation <br /> <br /> <br />woulo start about one mile east of DeBeque and join <br /> <br /> <br />the existing line at a point about 0.7 miles west of <br /> <br /> <br />Parachute. The relocation would include a 2,800-foot <br /> <br /> <br />tunnel. <br /> <br />o Minor relocations, including about 4.3 miles of <br /> <br /> <br />existing secondary roads and 2 miles of a 230-kV <br /> <br /> <br />transmission line. At the upper end of the reservoir, <br /> <br /> <br />in the town of Parachute and in the Battlement Mesa <br /> <br /> <br />Development, ten apartment buildings and a number of <br /> <br /> <br />municipal facilities would have to be purchased and/or <br /> <br /> <br />relocated. <br /> <br />PROJECT COST <br /> <br />The total capital cost, expressed in January 1982, price <br />levels unadjusted for inflation during construction and the costs <br />of financing, was estima.ted to be $181.,588,000. Estimates of the <br />total investment cost of the project, based on an assumed June <br />1991, on-line date and eight percent annual inflation, were <br />illustrated by assuming that financing would be provided either <br /> <br />-6- <br />