My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 12/02/1982
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
Board Meeting 12/02/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:59:26 PM
Creation date
10/4/2006 6:52:02 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
12/2/1982
Description
CWCB Meeting
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />the Una Dam and Reservoir, including potential hydroelectric <br />generation facilities. These appraisal-level engineering studies <br />include: <br /> <br />o An evaluation of the hydrological and sedimentation <br />characteristics of the Colorado River at Una Dam. <br /> <br />o An analysis of the water rights and storable flows <br />available for Una Reservoir. <br /> <br />o Reservoir operation studies for power development. <br /> <br />o Appraisal level engineering designs and associated cost <br /> <br /> <br />estimates, including capital, operation, maintenance and <br /> <br /> <br />replacement costs. <br /> <br />o Preparation of a comprehensive report which summarizes <br />the work completed during the study. <br /> <br />HYDROLOGY AND RESERVOIR SEDMIMENTATION <br /> <br />The estimated average annual runoff at the dam site is 3,600 <br />cfs or 2,600,000 acre-feet per year. The probable Maximum Flood <br />(PMF) flow for which the spillway is designed is estimated to be <br />130,000 cfs. This flood peak is composed of the runoff resulting <br />from the probable Maximum precipitation (PMP) plus the maximum <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.