My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01250
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01250
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:59:22 PM
Creation date
10/4/2006 6:51:59 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
12/9/1964
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />electrical works, electrical facilities, is <br />about 80 percent completed at this time. <br /> <br />I <br /> <br />Also, I believe most of you are aware of, <br />and many of you attended the dedication at <br />Flcuning Gorge in August when Mrs. Lyndon B. <br />Johnson attended and was principal participant. <br />The Flaming Gorge powerplant is meeting its <br />firm contract loads. It is continuing to be <br />drawn down. On November 29th it had a total <br />in storage of 1,290,000 acre-feet. <br /> <br />Going on to Navajo Dam, discharge is about <br />at the rate of 500 c.f.s. The reservoir is <br />slowly receding. On November 29th it had in <br />storage about 409,000 acre-feet of water. <br /> <br />We are getting into a rather critical <br />period as far as reservoir storage is con- <br />cerned. It is estimated at the present time <br />in the next six months' period that the inflows <br />will exceed our water requirements by about 1/2 <br />million acre-feet. We'll reach a very critical <br />period in about March or April of this coming <br />year. <br /> <br />I <br /> <br />As far as construction work is concerned <br />on our Curecanti Project, Blue Mesa Reservoir <br />and Dam and Powerplant is presently about <br />80 percent completed; that is, on the prime <br />contract. The work since the middle of Novem- <br />ber has essentially stopped, that is, the <br />earthfill, because of inclement weather. At <br />Morrow Point Dam the work is not progressing <br />quite as fast as we would like to see it. <br />There has been some difficulty in rock slides, <br />particularly on the left abutment and consid- <br />erable time has been spent trying to correct <br />this situation. A lot of rock bolting and <br />things of that nature have been done. We have <br />completed all of our core drilling on the <br />Crystal Reservoir. It is anticipated that in <br />January 1965 a contract will be let for a <br />rather difficult access road into this third <br />dam of the Curecanti Unit. We anticipate that <br />by late fall we will be calling for construc- <br />tion of this dam. <br />