My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01205
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01205
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:59:04 PM
Creation date
10/4/2006 6:51:34 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
2/11/1981
Description
CWCB Meeting
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />UTE WATER CONSERVANCY DISTRICT <br />PROJECT (CONT'D.) <br /> <br />(d) A 5 million gallon storage tank adjacent to the existing <br /> <br />1 million gallon Redlands tank. Funding for Phase I has <br /> <br />already been approved by the Board and the Legislature has <br /> <br />authorized in SB67 (1980 Session) $1,000,000 for state <br /> <br />participation. <br /> <br />Phase II includes: <br /> <br />(a) A 24 inch line extending from 26 Road on H Road to 1-70 <br /> <br />interchange and South across the Colocado River. <br /> <br />(b) A 5 million gallon storage tank at East Orchard Mesa. <br /> <br />(c) A 10 million gallon treatment plant next to existing filter <br /> <br />plant. <br /> <br />(d) A 12 million gallon treatment plant next to existing filter <br /> <br />plant. <br /> <br />(e) A 30 inch line from the end of the 36 inch line in (a) of <br /> <br />Phase I extending north to the five million gallon tank in (f). <br /> <br />If) A.5 million gallon storage tank to be located at the Grand <br /> <br />Junction airport. <br /> <br />(g) A 24 inch line extending from the end of (a) on Phase II to <br /> <br />tie into the proposed 5 million gallon tank in (d) Phase I. <br /> <br />(h) A 30 inch line extending from the end of (c) in Phase I to 26 <br /> <br />and I Roads. <br /> <br />(i) An 18 inch line extension from Highway 340 tie of 24 inch line <br /> <br />west, across Colorado River to tie into a 12 inch line at <br /> <br />Highway 50 at K Road. <br /> <br />The total estimated cost of both phases of the project including construc- <br /> <br />tion, engineering, right of way, permits, construction management and <br /> <br />- 3 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.