My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01205
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01205
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:59:04 PM
Creation date
10/4/2006 6:51:34 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
2/11/1981
Description
CWCB Meeting
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />UTE WATER CONSERVANCY DISTRICT <br />PROJECT (CONT'O) <br /> <br />the need to loop some of the mains in the north area. A new trans- <br /> <br />mission pipeline is also needed to sustain the distribution of water <br /> <br />,when the original transmission pipeline has to be shut down for <br /> <br />maintenance and repairs. <br /> <br />fQgB~~!_STAT~~ <br /> <br />On JanuarY 5, 1979, and subsequantly on July 25, 1980, the Ute <br /> <br />Water Conservancy District filed an application for financial assist- <br /> <br />ance from the Colorado Water Conservation Board Construction Fund fpr <br /> <br />a proposed project. The district subsequently agreed to co-fund a <br /> <br />feasibility report on the project with the Colorado Conservation <br /> <br />Board (CWCB). This report has been prepared and submitted to the <br /> <br />CWCB by Western Engineers, Inc., the district's consulting engineers <br /> <br />in Grand Junction, Colorado. The report concludes that, in order to <br /> <br />eliminate the serious problems stated earlier in this summary, new <br /> <br />tranemission lines and additional storage tanks are needed, as well <br /> <br />as the need to loop some of the north area mains in the distribution <br /> <br />system. <br /> <br />~BQ~Q~~Q_~BQJEf! <br /> <br />The proposed project is in two phases: <br />Phase I includes: <br /> <br />(al A 36 inch line from the treatment plant to 29 3/4 Road north <br /> <br />of 1-70. <br /> <br />(b) A 24 inc~ line from the end of the 36 inch line in (a) above <br /> <br />south to tie into an existing 18 inch line on F Road. <br /> <br />(cl A 30 inch line from the end of the 36 inch line in (al above, <br /> <br />west to Horizon drive to tie into existing 18 inch and 8 inch <br /> <br />lines. <br /> <br />- 2 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.