Laserfiche WebLink
<br />, <br />;/ <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />I <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />MEMORANDUM <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />John Van Sciver, P.E. jVJ~V- <br />Mike Serlet, P.E., Chief <br />Water Supply Planning and inance Section. <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />FROM: <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />DATE: July 18, 2003 <br /> <br />SUBJECT: Agenda Item 21g., July 28-30,2003 Board Meeting <br />Water Supply Planning and Finance Section - New Project Loans <br />Victor & Margie Quint <br /> <br />Introduction <br />Victor and Margie Quint are applying for an $85,500 loan to construct the Quint Augmentation <br />site; consisting of a recharge well, a pipeline, and a recharge pond. The estimated total cost of the <br />project is $95,000. Please see the attached project summary and map. <br /> <br />Backaround <br />The Quint Farm, located in Morgan and Washington Counties, consists of approximately 740 <br />acres, Irrigation water is supplied by direct flow water rights, and by 4 irrigation wells. <br /> <br />Depletions from the pumping of these 4 wells must be replaced during times when there is a <br />"call" on the river by a senior downstream water right. GASP has successfully been used .for the <br />past 30 years to cover the depletions on these wells. However, GASP operates on a year-to- <br />year basis with no guarantee of continued coverage. The current drought has brought to the <br />foreground just how difficult it is to provide adequate augmentation for well users. GASP has <br />even indicated to its members that if the drought continues, well pumping may be curtailed. <br /> <br />Victor Quint wants to develop a recharge system that will generate augmentation water to be <br />used to offset the depletions caused by his 4 wells. By generating his own augmentation <br />credits, he can protect himself from possible curtailment and help GASP strengthen its <br />coverage in the same area of the river. <br /> <br />Feasibility Studies <br />Brent Nation, P.E. of Nation Engineering Services, has completed the feasibility study. The report <br />includes an evaluation of alternatives available to generate an augmentation supply for the Quint <br />Farm. <br /> <br />Victor and Maraie Quint <br />Victor and Margie Quint are individual borrowers. They own the land that makes up the Quint <br />Farm. <br />