My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01150
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:58:35 PM
Creation date
10/4/2006 6:50:36 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/24/1999
Description
WSP Section - Colorado River Basin Issues - Colorado River "15-Mile Reach" ESA Section 7 Consultation
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Mr. Ralph Morgenweck <br />Mr. Greg Walcher <br />Re: Upper Colorado River Basin Endangered Fish Species Recovery Program <br />May 6, 1999 <br />Page 3 <br /> <br />. <br /> <br />3. Gunnison River Basin: The Service is currently conducting a Section 7 consultation <br />on the operation of the Aspinall Unit. The long-anticipated "synthesis report" is due <br />out soon. The River District believes that the Aspinall Unit operation is critical to <br />protecting existing uses and providing for future uses within the Gunnison River <br />Basin, including the Uncompaghre River sub-basin. The picture is further <br />complicated by the quantification of the Black Canyon National Monument federal <br />reserved water right. Implementation of the 15MRPBO without a better <br />understanding of the role of the Aspinall Unit within the overall Recovery Program <br />strategy may be unacceptable to our Gunnison River constituents. <br /> <br />The River District fully understands that the 15MRPBO discussions have been difficult, and that the <br />process needs to reach a conclusion. We also understand that it will take time to discuss and address <br />the "other-basin" issues. However, I strongly believe that the other-baSin issues must be addressed <br />in order for the River District Board to make an informed decision on the 15MRPBO. <br /> <br />Please contact me. at your earliest opportunity to discuss these issues. <br /> <br />Sincerely, <br /> <br />. <br /> <br />~ &\.L- LL- <br /> <br />R. Eric Kuhn <br />Secretary/General Manager <br /> <br />REKlvm' <br />~: Bomdof~~on.CRVVCD <br />Peter Evans <br />Hcmy Maddux <br />TomPjtts <br />Board of Directors. CWCB <br />Janice Sheftel <br />CRBO List Server <br />Upper Yampa Water Conservancy District <br />Rio Blanco Waier Conservancy District <br />Ye1low Jacket Water Conservancy District <br />Upper Gunnison River Water Conservancy District <br />Tri-County Water Conservancy District <br />Uncompaghre Valley Walet Users Association <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.