My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01119
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:58:22 PM
Creation date
10/4/2006 6:50:23 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
2/11/1965
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />developments on that project is the possibility <br />of including water for a thermal powerplant in <br />the San Miguel River area. This powerplant <br />would be planned by the Colorado-Ute Electric <br />Association. <br /> <br />'I <br /> <br />On the Upper Gunnison Project we are <br />initiating work on that project consisting of <br />land classification, agricultural economy <br />studies, and water requirements. We are also <br />starting certain hydrology studies to determine <br />the possibility of coordinated operation between <br />the Taylor Park and Curecanti units. <br /> <br />The Battlement Mesa project is approximately <br />two-thirds finished and we hope to complete that <br />report in the last half of 1966. <br /> <br />The Bluestone,Grand Mesa and Yellow Jacket <br />Projects are just about on schedule. <br /> <br />As far as advance planning studies are con- <br />cerned, we are p~esently under way on both the <br />Bostwick Park and Fruitland Mesa P~ojects. The <br />Bostwick Park project, as you probably know, <br />has been included as a new construction start <br />and moneys are included for construction in the <br />President's budget. We are presently engaged <br />in negotiating with the conservancy district for <br />a repayment contract. <br /> <br />We anticipate starting advance planning <br />studies on the savery-pot Hook Project if the <br />money is allowed in the present budget. <br /> <br />1 <br /> <br />On our small reclamation projects, the first <br />small project in Colorado was the Orchard City <br />Irrigation District and it is essentially com- <br />pleted. Final testing of the pumps is scheduled <br />for the 15th of February. Some little difficulty <br />has developed in one of the heat exchangers but <br />it is essentially finished and most of the plan- <br />ning has been completed. This project was com- <br />pleted well below the estimated cost and it is <br />hopeful that enough money will be left over for <br />a small amount of canal lining. <br />
The URL can be used to link to this page
Your browser does not support the video tag.