My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01111
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:58:14 PM
Creation date
10/4/2006 6:50:04 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
6/3/1970
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />b~~~ <br /> <br />1 <br /> <br />last year appropriated $100,000 to fund 1967 <br />legislation which provided waste treatment con- <br />struction grants to destitute communities from <br />state sources. The staff has now prepared <br />application forms, contract forms, and a set of <br />criteria on which the commission will act upon <br />for distributing this state assistance which, so <br />far, is in the amount of $100,000. <br /> <br />A feedlot survey was conducted statewide <br />by a temporary employee and the results are <br />presently being cross checked with a computer <br />list of feedlots in the state to arrive at a <br />final up-to-date list of feedlots. Criteria for <br />waste treatment facilities for feedlots are <br />presently under preparation. <br /> <br />A total of 166 inspections or visits were <br />made to 118 industrial waste treatment plants. <br />A total of 201 inspections were made on munici- <br />pal, state and federal waste treatment plants. <br />20 sets of plans and/or reports were reviewed <br />for proposed industrial waste facilities repre- <br />senting an estimated cost of construction of <br />these new facilities of $65~ million. <br /> <br />A document, 'Criteria Review of Waste Watel <br />Treatment Facilities', has been updated. A <br />septic tank booklet was developed and prepared <br />in cooperation with the Colorado State Univer- <br />sity. <br /> <br />Rules and regulations for subsurface dis- <br />posal systems have been developed and approved <br />by the Water Pollution Control Commission and <br />are expected to be cleared through the attorney <br />general's office shortly. <br /> <br />1 <br /> <br />Proposed changes in water quality standards <br />and proposed changes in stream classifications <br />were developed by the staff and hearings were <br />held in March and April of this year. Adoption <br />is expected of these, in some form, by the Water <br />Pollution Control Commission in June or July of <br />this year. The meeting next Tuesday will probably <br />consider these proposed changes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.