Laserfiche WebLink
<br />, . <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />ATTACHMENT 2 <br /> <br />FPR 00-521 <br />South Weld 1-25 Corridor Master Drainage Plan, February 17,2000. <br /> <br />KEY ISSUES: <br />. The master plan study was prepared by Anderson Consulting Engineers in their Fort Collins office. <br /> <br />. Project sponsors include Weld County, Dacono, Dacono Sanitation District, Erie, Firestone, Frederick, <br />St. Vrain Sanitation District, and Tri- Town Sanitation District. CWCB staff provided technical <br />assistance to the project as well on behalf of Weld County. <br /> <br />COMMUNITY RESPONSE: <br />A description of the CWCB designation process was included within the report. The Weld <br />County project manager for this study was contacted via telephone by CWCB staff to discuss <br />the study and the floodplain designation process. Verbal consent was granted for the staff to <br />proceed with review, and for the Board to designate and approve the study. Any revisions or <br />changes to the study or project will be brought to the Board's attention at a future meeting: <br />Therefore, formal designation and approval for this study is being taken under Rule 9.D.l, <br />community request. <br /> <br />SUMMARY: <br />The staff recommends Board approval of the floodplain resolution for Weld County, and the <br />affected communities within the county, designating the February 17, 2000 master drainage plan. <br />Formal action by the Board will assure that the floodplain information has been appropriately <br />recognized by the state, thereby complying with state statutory requirements. The designation <br />request for this study has now been tabled until the September 2000 Board meeting at the <br />request ofthe community. <br /> <br />5 <br />