My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01062
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01062
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:57:36 PM
Creation date
10/4/2006 6:49:19 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/23/2001
Description
Severance Tax Project Changes
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Willow Creek (Creede) Stream Restoration Study $ 15,000,00 <br />Upper Colorado River Project Phase III $ 25,000.00 <br />North Fork hnprovements $ 50,000,00 . <br />Southern High Plains Ground Water $ 65,000.00 <br />Stream & Lake Protection <br />Stream and Lake Monitoring and Planning $ 60,000.00 <br />GIS Pilot Proj ect $ 25,000.00 <br />New Appropriations Identification $ 25,000.00 <br />Conservation Planning <br />Water Education Projects $ 50,000,00 <br />GIS Technical Services $ 15,000.00 <br />Drought Planning $ 30,000.00 <br />GRAND TOTAL $ 585,000.00 <br /> <br />With few exceptions, the programs and projects will be implemented as planned, However, we are <br />proposing the following changes to the projects lis.ted above: <br /> <br />1. Mapping - Black Squirrel Creek (EI Paso County) <br /> <br />The Black Squirrel Floodplain Mapping Project was !originally scheduled to be a cooperative <br />floodplain project among the CWCB, NRCS, and EliPaso County. EI Paso County following the <br />floods that occurred in 1995 requested the project. T~e NRCS funds have not been appropriated for <br />the project. The CWCB has now requested funding 'from FEMA and expects to receive funding for <br />the project in FY 02-03. In an effort to maximize thfl Board's floodplain mapping funds, the Board <br />staff filled a need to transfer these funds to two on ~oing floodplain projects, These projects are: <br /> <br />. <br /> <br />. The Otis Floodplain Mapping Project - During the project review, the Board staff found that the <br />original hydrology was in error, which will results in additional technical studies, Following <br />these new investigations, the project should be f).nalized and available for floodplain approval and <br />designation, . <br /> <br />. Alamosa River Floodplain Study - During the initial construction of certain project features, a <br />number questions were presented regarding the.hydrology and hydraulic analyses for the project. <br />The Board staff fined that it is desirable to perf~rm a detail hydrology and hydraulic <br />determination fully evaluates the stream flow regime. This evaluation will result in a better <br />project design, i <br /> <br />Recommendation: Staff should reallocate funds a~ proposed. <br /> <br />2. Drought Planning <br /> <br />When requested more than 18 months ago, we had anticipated conducting the Drought Planning <br />Survey/Carry-over Storage Assessment using sev~rance tax funds, Following this request it became <br />obvious that more funds would be required to conip1ete the survey properly so a Construction Fund <br />request was prepared and was adopted by the Gen~ral Assembly. As a result, are recommending <br />reallocated the funds as follows: i <br /> <br />. Provide $10,000 to complete an irrigation/dr:ainage efficiency demonstration project in the . <br />Holly area being conducted in cooperation with Colorado State University and the Northeast <br />Prowers Soil Conservation District. <br />
The URL can be used to link to this page
Your browser does not support the video tag.