My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01054
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:57:34 PM
Creation date
10/4/2006 6:49:13 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/29/1999
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />DNR - Division of Wildlife - Native Aauatic Species Restoration Facilitv <br /> <br />Authorization: SB 98-1189 <br />Water Source: San Luis Valley Aquifers <br />Terms of Loan: $2,000,000 Grant <br /> <br />County: Alamosa - W of Alamosa <br />Project Yield: NI A <br />Project Type: Aquatic Species Hatchery <br /> <br />This project is the construction of a Native Aquatic Species Restoration Facility just west of <br />Alamosa. The project is being managed and 60% funded by the Division ofWild1ife. FishPro, Inc. <br />of Port Orchard, Washington is currently preparing construction plans and specifications. <br />Construction is scheduled to commence in June 1999 with completion scheduled for June 2000. <br /> <br />Consolidated Mutual Water Companv - Fortune Reservoir Dam Construction <br /> <br />Authorization: SB 99-173 <br />Water Source: Clear Creek <br />Terms of Loan: $10,000,000 @4.75%for 10 years <br /> <br />County: Jefferson - NW of Arvada <br />Project Yield: 8,869 ac.ft. <br />Project Type: New Dam Construction <br /> <br />This project is the construction of a new 9,000 acre foot reservoir northwest of Arvada The <br />project consists of a 105 foot high, zoned earth embankment, Probable Maximum Flood emergency <br />spillway, with a 30 inch diameter outlet pipe. The Company has contracted with Tuttle-Applegate, <br />Inc. of Denver to prepare the final design drawings and construction contract documents. <br />Construction is scheduled to commence in the fall of 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.