My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01050
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:57:32 PM
Creation date
10/4/2006 6:49:11 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/21/1998
Description
Flood Section - South Platte River Channel Project - Right-of-Way Action
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Use for the Requested Area is for the construction of a bike path on an 8 foot x 60 foot <br />requested easement. If granted, the easement will not restrict any future easements/activities . <br />within the CWCB project ROW because the project will be built on the existing grade. <br /> <br />Conditions for the Easement - If the easement is granted, the owner shall comply with the <br />following conditions: <br /> <br />1) TIME PERIOD - The EASEMENT shall be for a term of 25 years. <br /> <br />2) PERMITS - The owner shall be responsible for securing and monitoring all required <br />federal, state, and local permits pertaining to Colorado waters and streams. <br /> <br />3) INSURANCE COVERAGE - The CWCB shall be named as an additional insured, and <br />shall have coverage in the amounts established by the Colorado Governmental Immunity <br />Act - part one of article 10 of title 24, C.R.S., as amended. <br /> <br />4) FEE CONSIDERATIONS - Staff recommends that the applicant be charged the minimum <br />fee. <br /> <br />5) RECLAMATION OF THE SITE - A reclamation plan shall be developed and provided <br />to the CWCB for approval prior to the completion of the project. <br /> <br />6) <br /> <br />NON-EXCLUSIVE EASEMENT CLAUSE - The easement, if granted, will be a non- <br />exclusive easement. However, CWCB will reserve its right to access the area. <br /> <br />. <br /> <br />REQUESTED EASEMENT <br /> <br />Action Requested: <br />For the City request, an easement is requested for the relocation and construction of the bike path <br />within the CWCB project right-of way (ROW). The staff recommends an easement area of <br />\ approximately 8' x 60' which is located adjacent of the Board's easterly ROW line adjacent to <br />easterly limits of the trail/bike path. <br /> <br />RECOMMENDATION <br /> <br />Following a review by the AG's Office and CWCB staff for Agenda Item 6.b., a <br />recommendation is as follows: <br /> <br />Approve the easement request from the City of Littleton for the relocation and <br />construction of the bike path and the minimum standard fee as stated for the easement <br />granted by the Colorado Water Conservation Board for lands within the South Platte <br />River Chaunel Improvement Project right-of-way (ROW). This non-exclusive easement <br />will cover an 8' x 60' area as delineated on Exhibit A. Grant the authorization to the staff <br />to prepare the necessary easement docum;nts. . <br />
The URL can be used to link to this page
Your browser does not support the video tag.