My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01033
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:57:25 PM
Creation date
10/4/2006 6:48:59 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/13/1963
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />an estimate of Two Forks Dam and we have a <br />proposal for flood control of Bear, Turkey, and <br />Clear Creeks and we are working on a possible <br />storage site out east of Barr Lake. The report, <br />as we visualize it, will contain an inventory of <br />the potential water developments on the tribu- <br />taries and better information, reconnaissance <br />type data the way the Bureau classifies it, on <br />the main stem developments. The major feature <br />on the main stem would be the Two Forks Reser- <br />voir in the South Platte Canyon above Denver. <br />We presently think it might contain a capacity <br />of 800,000 acre-feet and would be formed by a <br />concrete arch dam about 500 feet high. The <br />study must establish the location of this dam <br />and the possibility of an afterbay below the dam <br />so that construction presently being planned by <br />Denver and Aurora can complement the best Two <br />Forks plan rather than conflict with it. The <br />main stem analysis will consider municipal and <br />industrial needs, routing of water through <br />Denver, utilization of municipal return flows <br />and sewage effluents. It seems storage below <br />Denver will be required and it appears that <br />offstream storage might be better than onstream. <br /> <br />We held a meeting with the Chief Engineer <br />to establish the procedure for Obtaining the <br />data for making the estimate of the Two Forks <br />Dam. Our geologists and designers are inspect- <br />ing the site today again. <br /> <br />On the Fryingpan-Arkansas Project, final <br />approval of Ruedi Dam and Reservoir site was <br />made by the Commissioner after the appraisal of <br />the consultant board appointed by the Secretary <br />of the Interior. <br /> <br />I <br /> <br />Design data is being accumulated for the <br />county road around the reservoir for submission <br />to the Chief Engineer. <br /> <br />Triangulation points have been established <br />and checked for the Divide Tunnel of the Frying- <br />pan-Arkansas Project. This was done by importing <br />personnel from Grand Island, Nebraska, using the <br />tellurometer instrument and transporting the <br />
The URL can be used to link to this page
Your browser does not support the video tag.