Laserfiche WebLink
<br />I <br /> <br />an estimate of Two Forks Dam and we have a <br />proposal for flood control of Bear, Turkey, and <br />Clear Creeks and we are working on a possible <br />storage site out east of Barr Lake. The report, <br />as we visualize it, will contain an inventory of <br />the potential water developments on the tribu- <br />taries and better information, reconnaissance <br />type data the way the Bureau classifies it, on <br />the main stem developments. The major feature <br />on the main stem would be the Two Forks Reser- <br />voir in the South Platte Canyon above Denver. <br />We presently think it might contain a capacity <br />of 800,000 acre-feet and would be formed by a <br />concrete arch dam about 500 feet high. The <br />study must establish the location of this dam <br />and the possibility of an afterbay below the dam <br />so that construction presently being planned by <br />Denver and Aurora can complement the best Two <br />Forks plan rather than conflict with it. The <br />main stem analysis will consider municipal and <br />industrial needs, routing of water through <br />Denver, utilization of municipal return flows <br />and sewage effluents. It seems storage below <br />Denver will be required and it appears that <br />offstream storage might be better than onstream. <br /> <br />We held a meeting with the Chief Engineer <br />to establish the procedure for Obtaining the <br />data for making the estimate of the Two Forks <br />Dam. Our geologists and designers are inspect- <br />ing the site today again. <br /> <br />On the Fryingpan-Arkansas Project, final <br />approval of Ruedi Dam and Reservoir site was <br />made by the Commissioner after the appraisal of <br />the consultant board appointed by the Secretary <br />of the Interior. <br /> <br />I <br /> <br />Design data is being accumulated for the <br />county road around the reservoir for submission <br />to the Chief Engineer. <br /> <br />Triangulation points have been established <br />and checked for the Divide Tunnel of the Frying- <br />pan-Arkansas Project. This was done by importing <br />personnel from Grand Island, Nebraska, using the <br />tellurometer instrument and transporting the <br />