My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01029
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:57:20 PM
Creation date
10/4/2006 6:48:58 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/22/2000
Description
Flood Section - Rio Grande Basin - Alamosa Flood Protection Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ALAMOSA LOCAL FLOOD CONTROL PROJECT: CHRONOLOGY PAGE: 3 <br /> <br />07/01/87 COE issues Pennit No, CO-OTI -0506 to the <br /> City of A1amosa for Phase 2, noting that <br /> previous work regarding the proposed project <br /> was done under Permit No. CO-OYT -0461 <br /> (phase 1). <br />07/2'2J87 DOLA certifies Phase I complete at a cost of <br /> $750,000. <br />09/15/88 City sends COE letter requesting that work <br /> done on Phase 2 (from August to December, <br /> 1987) be credited to local match should future <br /> phases oflevee project be done by COE. <br /> Phase 2 costs were $351,982.67, <br />04/12/90 COE issues status report for project <br /> preconstruction engineering and design <br /> activities in A1amosa, Report indicates <br /> estimate cost for project, $7,203,000 (phase <br /> 3), less credits of$I,338,000; status of <br /> feasibility report (scheduled for completion in <br /> May 1990) and beginning of preconstruction <br /> engineering and design studies in June 1990, <br /> with detailed engineered studies to be <br /> completed in March 1993, <br />08/07/90 Memo sent to city council and county <br /> commissioners updating levee project, with <br /> infonnation taken from summary of completed <br /> feasibility report, including local cash match <br /> needed after credits applied and description of <br /> proposed plan. <br />] 0/22/90 Based on completing their review ofCOE's <br /> draft feasibility report, City council sends <br /> letter of intent (signed by Mayor Bervig) to <br /> COE to support continuation of planning, <br /> engineering and design studies for the project. <br />10/23/90 County commission sends letter of intent <br /> (signed by Commissioner Zimmerman) to <br /> COE for same. <br /> <br />.!< <br /> <br />. <br /> <br />. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.