My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01021
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:57:11 PM
Creation date
10/4/2006 6:48:47 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/11/1998
Description
CF Section - Update on Existing Authorizations - Ute Water Conservancy District - Plateau Creek Pipeline Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br /> <br />~ . <br /> <br />The projection also indicates that the average residential water bill will increase from <br />about $20 per month to about $25 per month, or about 25 percent. The District's water <br />rates have not been adjusted since 1984. <br /> <br />. <br /> <br />Conclusions <br /> <br />The following summarizes CWCB staff conclusions with respect to the Plateau Creek <br />Pipeline Replacement Project based on the most current information available: <br /> <br />1. The District's preferred alternative from the Environmental Impact Statement, <br />Alternative A, is capable of meeting the project objective of replacing the existing <br />pipeline with a facility having sufficient capacity to meet projected year 2045 peak <br />demands. It has the lowest life cycle cost and the least cost per acre-foot of the three <br />alternatives, which meet the project purpose. The District has adequate water rights <br />for operation of the project. <br /> <br />2, The overall environmental impact of the project is relatively low and most impacts <br />can be minimized or mitigated. Depletions to the Fifteen-Mile Reach of the Colorado <br />River will be offset by the Reasonable and Prudent Alternative developed in the <br />Section 7 consultation process. <br /> <br />3. The District's current financial condition is strong based on the indicators in Table 5, <br />The 35-year financial projections prepared by the District staff indicate that debt <br />service coverage will be adequate for the entire period of debt retirement on all <br />Construction Fund loans. Expenditures are projected to exceed revenues for several <br />years during the period of debt retirement but it does not appear as if financial <br />reserves will be drawn down to a level that would lead to concern. <br /> <br />. <br /> <br />4. The District's financial projections assume a rate increase, or series of rate increases, <br />in the next several years such that the average residential water bill will increase from <br />about $20 to $25 per month. This appears reasonable relative to the rates of other <br />water providers in the state and indicates that the proposed project is economically <br />feasible in terms of the impact on residential water users. <br /> <br />No action is requested of the Board for this agenda item. <br /> <br />Cc: Larry Clever, Ute WCD <br />Linda Bassi, AGO <br /> <br />Attachments <br /> <br />. <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.