My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01010
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:57:00 PM
Creation date
10/4/2006 6:48:33 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/19/2003
Description
CF Section - Changes to Existing Non-Reimbursable Investments - Fountain Creek Transit Loss Study
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />HBOO 1419 AS ENACTED: <br />SECTION 12. EI Paso county water master plan - appropriation. <br />(1) The Colorado water conservation board is hereby authorized to participate in a cooperative water supply <br />planning investigation and master plan of the rural EI Paso county area. The purposes of the investigation <br />will be to effectively identify the current and future development of water resources, systems, and facilities <br />benefitting the residents of EI Paso county. The scope of work for the master plan shall be developed by the <br />EI Paso county water authority in consultation with EI Paso county and the Colorado water conservation <br />board. <br />(2) In addition to any other appropriation, there is hereby appropriated, out of any Ch. 360 Water and <br />Irrigation moneys in the Colorado water conservation board construction fund not otherwise appropriated, to <br />the Colorado water conservation board for allocation to the EI Paso county water authority, the sum of two <br />hundred thousand dollars ($200,000), or so much thereof as may be necessary, to prepare an EI Paso <br />county water master plan. <br />(3) The moneys appropriated in subsection (2) of this section shall remain available for the designated <br />purposes until the project is completed. <br /> <br />PROPOSED REVISION: <br />(1) The Colorado water conservation board is hereby authorized to participate in a cooperative water supply <br />planning investigation and master plan of the rural EI Paso county area. The purposes of the investigation <br />will be to effectively identify the current and future development of water resources, systems, and facilities <br />benefitting the residents of EI Paso county. The scope of work for the master plan shall be developed by the <br />EI Paso county water authority in consultation with EI Paso county and the Colorado water conservation <br />board. The Colorado Water Conservation Board is further authorized to participate in a cooperative studv <br />and investiqation of transit losses on Fountain and Monument Creeks to be conducted bv the US Geoloqical <br />Survev and development of a transit loss model to be used in administerinq water deliveries that maximize <br />beneficial use of the water resources of EI Paso countv. <br /> <br />(2) In addition to any other appropriation, there is hereby appropriated, out of any Ch. 360 Water and <br /> <br />Irrigation moneys in the Colorado water conservation board construction fund not otherwise appropriated, to <br /> <br />the Colorado water conservation board for allocation to the EI Paso county water authority, the sum of two <br /> <br />hundred thousand dollars ($200,000), or so much thereof as may be necessary, for the purposes set forth in <br /> <br />subsection (1). te FlreFl8r-8 8ti ~I Pass S8~tity v:ater FA8ster Fllati. <br /> <br />(3) The moneys appropriated in subsection (2) of this section shall remain available for the designated <br />purposes until the project is completed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.