My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01007
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:56:57 PM
Creation date
10/4/2006 6:48:22 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/20/2002
Description
Summary Minutes and Record of Decisions - May 20-21, 2002
Board Meetings - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-7 - <br /> <br />Wilkinson seconded, a motion to: 1) authorize the Staff to work with the <br />UGRWCD to seek an extension of time under which the Board may submit its <br />findings and recommendations; 2) approve the Staff's requests set forth <br />above; and, 3) schedule the UGRWCD hearing in Gunnison, in conjunction <br />with the Board meeting that will also be held in Gunnison, with possible dates <br />of 10,11,12 and 13. The motion was approved (8-0). <br /> <br />2la. Flood Protection Program - Floodplain Designation Update <br />Track 4, Start/Stop: <br />Action: Information item; no formal action taken. <br /> <br />2:51 :00-3:05:55 <br /> <br />2lc. Flood Protection Program - South Platte River Easement Request-Echo Star Satellite <br />System <br />Track 4, Start/Stop: 3:05:55-3:05:55 <br />Action: A motion was made by Ray Wright and seconded by Harold Miskel to <br />approve the easements to Echo Star conditioned upon Echo Star finalizing its <br />easement agreement with CWCB for the encroachment of its patio onto <br />CWCB's property. Motion was approved (7-0). <br /> <br />22a. Colorado River Basin Issues - Colorado River (Mainstream) Basin Director's Report <br />Track 5, Start/Stop: 0000-1: 17 <br />Action: No director's report available. <br /> <br />22b. Colorado River Basin Issues - Yampa-White River Basin Director's Report <br />Track 5, Start/Stop: 1:17-4:10 <br />Action: Information item; no formal action taken. <br /> <br />22c. Colorado River Basin Issues - San Juan/San Miguel-Dolores River Basin Director's <br />Report <br />Track 5, Start/Stop: 4: 10-9:30 <br />Action: Information item; no formal action taken. <br /> <br />22d. Colorado River Basin Issues - Gunnison River Basin Director's Report <br />Track 5, Start/Stop: 9:30-9:40 <br />Action: No Director's Report Available. <br /> <br />22e. Colorado River Basin Issues - Colorado River Annual Operating Plan 1 Glen Canyon <br />Adaptive Management <br />Track 5, Start/Stop: 9:40-29:29 <br />Action: Information item; no formal action taken, but the Board indicated general <br />support for the actions staff was suggesting in the memorandum to the Board <br />on this item. <br /> <br />22f. Colorado River Basin Issues - Ruedi Reservoir - Long Term Contract for Endangered <br /> <br />Fish Water <br /> <br />Track 5, Start/Stop: 29:29-42:00 <br /> <br />Action: A motion was made by David Smith and seconded by Carolyn McIntosh to <br /> <br />approve the proposed I-year contract with the Bureau of Reclamation and the <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />