My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00991
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:56:50 PM
Creation date
10/4/2006 6:47:55 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/25/1995
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Colorado Water Conservation Board <br />~epartment of Natural Resources <br /> <br />~21 State Centennial Building <br />1313 Sherman Street . <br />Denver. Colorado 80203 <br />Phone (303) 866-3441 <br />FAJ( (303)866-4474 <br /> <br />11'3 <br />STATE OF COLORADO <br /> <br />o <br /> <br />Roy Romer <br />Governor <br /> <br />James S.lN";1:1}II~~tt <br />ExecDliv. Director, DNR <br />Dati.. C.W.. P.E. <br />Director, CWCB <br /> <br />MEMORANDUM <br /> <br />TO: <br /> <br />Colorado Water Users and Interested Persons <br /> <br />William P. Stanton, P.E. ~?? <br />Chief, Project Planning and Construction Section <br /> <br />FROM: <br /> <br />DATE: <br /> <br />January 17, 1995 <br /> <br />eSUBJECT: <br /> <br />1995 CWCB Construction Fund Bill, HB 95-1155 <br /> <br />This memo is a summary of this year's Construction Fund bill ,as introduced in the House on <br />January 12, 1995. There are eleven sections in the bill. <br /> <br />SECTION I of the bill is the usual list of recommended project loans in priority order. This year's <br />bill contains 17 proposed projects totalling $11,094,500 as follows: <br /> <br />o Left Hand Ditch Company: The company has requested a $370,000 loan to enlarge the spillway <br />of Left Hand Reservoir in Boulder County. The feasibility study has been completed. The project, <br />which is for 75% of the project costs, will save the entire 1,624 acre-feet in the reservoir from <br />being restricted. by the State Engineer. The new stepped spillway and stilling basin will be <br />constructed with roller compacted concrete. <br /> <br />o <br /> <br />Red Mesa Ward Reservoir Company: The company has requested a $2,250,000 loan to' <br />. t <br />rehabilitate and enlarge Red Mesa Ward Reservoir. The reservoir, also known as Mormon <br />Reservoir, is located south of Hesperus on Hay Gulch in La Plata County. The total cost of the' <br />project is estimated at $3,000,000. The reservoir has a capacity of 1,172 acre-feet. The project' <br />will resolve dam safety issues and enlarge the dam to increase the reservoir capacity by 2,900 acre-' <br />feet. <br /> <br />e <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.