My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00991
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:56:50 PM
Creation date
10/4/2006 6:47:55 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/25/1995
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />be assumed to be $150,000 per year. <br /> <br />The total annual cost of operation of the ARBWMP under the above assumptions would be <br /> <br />between $815,000 to $1,050,000 per year. If fees were assessed on the basis of per acre-foot <br /> <br />of pumping per year and the pumping averages 150,000 acre-Ieet per year, the cost to a well <br /> <br />owner for each acre-foot pumped would be in the range of $5.43 to $7.00 per acre-foot. <br /> <br />There may be other fee structures that would be viewed to be more equitable, taking into <br /> <br />consideration the complex political and economic issues involved in the Arkansas River Basin. <br /> <br /> <br />These would be considered by the Board 01 Directors as the project is developed. <br /> <br />ARBWMP <br /> <br />- 4 - <br /> <br />e <br /> <br />e <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.