My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00991
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:56:50 PM
Creation date
10/4/2006 6:47:55 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/25/1995
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br />e <br /> <br />- <br /> <br />- <br /> <br />'i <br /> <br />STATE OF COLORADO <br /> <br />o <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br /> <br />721 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone (303) 866-3441 <br />FAX (303) 866-4474 <br /> <br />Roy Romer <br />Governor <br /> <br />James S. Lochhead <br />Executive Director, DNR <br /> <br />MEMORANDUM <br /> <br />Daries C. Lile. P.E. <br />Director. CWCB <br /> <br />TO: <br /> <br />CWCB Board . n <br />Daries C. Lile ~L- <br /> <br />FROM: <br /> <br />DATE: <br /> <br />January 16, 1995 <br /> <br />SUBJECT: <br /> <br />Agenda Item 3: Director's Report - January 25, 1995 <br /> <br />The following is a summary of major activities of the Director since the November 3-4, 1994 <br />Board Meeting: <br /> <br />Arkansas River: Meetings continue with the Arkansas River Coordinating Committee. We have <br />established three working subcommittees; one for the purpose of analyzing available sources of <br />augmentation supplies (Water Acquisition Subcommittee), another to refine the range of <br />depletions from groundwater pumping (Augmentation Water Subcommittee) and the third to <br />explore options for the integration of recreation and wildlife uses with augmentation opportunities <br />(Recreational Subcommittee). The working groups are meeting in January and a full committee <br />meeting will be held in February. <br /> <br />Hal Simpson and I have also proposed that a water management project be developed for the <br />Arkansas River. The project would be similar to a water bank, but would have additional <br />functions including acting as a depository for various sources of augmentation water, coordinating <br />the replacement of depletions, accounting for groundwater pumping, and purchasing water as <br />required. It is our opinion that the entity would need to be established by either legislation or <br />perhaps under the present conservancy laws. The Water Acquisition Subcommittee will be <br />reviewing the proposaL Attached to this report is a draft copy of the overall concept, which has <br />been mailed to the full committee. <br /> <br />Colorado River: The Secretary of Interior has advised the Seven Basin States that the plan to <br />conduct the flood releases (spike flows) from Lake Powell has been postponed indefinitely. <br />, . <br />However, it is our understanding that the U.S. Bureau of Reclamation intends to address the <br />
The URL can be used to link to this page
Your browser does not support the video tag.