Laserfiche WebLink
<br />. <br /> <br />" <br />.' <br /> <br />. <br /> <br />. <br /> <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br /> <br />. <br /> <br />3 <br /> <br />13 <br />1 from the natural basins of the Colorado or Arkansas Riv- <br />2 ers within Colorado into another river basin for delivery <br />3 or storage unless- <br /> <br />"( 1) the diversion is the subject of a decree en- <br /> <br /> <br />tered prior to the effective date of this section for <br /> <br /> <br />which no new infrastructure is necessary to divert <br /> <br /> <br />the water out of the natural basin, or <br /> <br />"(2) the diversion is the subject of an existing <br /> <br /> <br />agreement, eontemplating additional diversions di- <br /> <br /> <br />verted through. or stored in the facilities authorized <br /> <br /> <br />by this Act, between the beneficiary of such <br /> <br /> <br />transbasin diversion and either the water conserva- <br /> <br /> <br />tion district, as defmed under Colorado law, from <br /> <br /> <br />within whose boundaries the waters are proposed for <br /> <br /> <br />diversion or, in the absence thereof, a water conser- <br /> <br /> <br />vancy district, as defined under Colorado law, that <br /> <br /> <br />is a project contractor and from within whose <br /> <br />boundaries the waters are. proposed for diversion, <br /> <br />"(3) the diversion is the subjeet of a future <br /> <br /> <br />intergovernmental agreement or other contractual <br /> <br /> <br />arrangement between the benefieiary of such <br /> <br /> <br />transbasin diversion and either the water conserva- <br /> <br /> <br />tion district, as defined under Colorado law, from <br /> <br /> <br />within whose boundaries the waters are proposed for <br /> <br /> <br />diversion or, in the absenee thereof, a water conser- <br /> <br />.HR 1714 1H <br />