<br />-.lV-.I. <br /> <br />Water supply studies, engineering sur- <br />veys, geologic investigations, and preparation <br />of the plan formulation appendix are in <br />progress on the Bluestone project. A prepared <br />feasibility report is scheduled for completion <br />in FY 1967. <br /> <br />I <br /> <br />On the Upper Gunnison project, plan form- <br />ulation studies, water supply studies, land <br />classification studies, and drainage studies <br />are continuing. A proposed feasibility re- <br />port is scheduled for completion in FY 1969. <br /> <br />Feasibility investigations are contin- <br />uing on the Grand Mesa project, consisting of <br />water supply studies, plan formulation studies, <br />and preparation of plan formulation, drainage, <br />and land classification appendices. Aerial <br />topographic mapping of the Electric Mountain <br />service canal by private contract is in <br />progress. Foundation explorations on Cactus <br />Park Dam site (alternative for Gorsuch) have <br />been completed. A proposed feasibility re- <br />port is scheduled for completion in FY 1968. <br /> <br />Preparation of design data for the Yellow <br />Jacket Canal, Josephine Basin Canal, Lost park <br />collective systems, and project laterals are <br />in progress for the Yellow Jacl,et project. <br />Geologic investigations, and preparation of <br />project lands, drainage, and water supply <br />appendices are also in progress. A proposed <br />feasibility report is scheduled for comple- <br />tion in FY 1967. <br /> <br />I <br /> <br />Under advance planning, the Fruitland <br />Mesa project feasibility report data on <br />agricultural economy, land classification, <br />water supply, and cost estimates are being <br />reviewed to determine work that will be used <br />to be accomplished for the definite plan re- <br />port. <br /> <br />Advance planning studies have been <br />initiated on the Savery-pot Hook project. <br />