My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00978
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:56:29 PM
Creation date
10/4/2006 6:47:48 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/23/1998
Description
CF Section - Status Reports on Loan Projects - Pinon Mesa Ranches - Raw Water Pipeline Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />1 31 3 Sherman Street <br />Denver, Colorado 80203 <br />Phone, (303) 866-3441 <br />FAX, (303) 866-4474 <br /> <br />STATE OF COLORI\DO <br /> <br />- <br /> <br />MEMORANDUM <br /> <br />Roy Romer <br />Governor <br /> <br />James S. Lochhead <br />Executive Director, DNR <br /> <br />Daries C. lite, P.E. <br />Director, ewes <br /> <br />Peter H. Evans <br />Acting Director, ewCs <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />FROM: <br /> <br />I,}J<? <br /> <br />Bill Stanton, P.E., Chief, Project PI~Jgf1d Construction Section <br />Mike Serlet, P .E., Project Manager r; .J . <br /> <br />November 17, 1998 <br /> <br />DATE: <br /> <br />SUBJECT: Agenda Item 28a - November 23-24, 1998, Board Meeting <br />Water Project Construction Loan Program <br />Status Report on Loan Projects <br />Pinon Mesa Ranches - Raw Water Pipeline Project <br /> <br />tit Introduction <br /> <br />This item is presented to update the Board on the current situation with respect to <br />the Pinon Mesa Ranches Community Association's (PMRCA) raw water project. <br /> <br />Backlrround <br /> <br />At the July Board meeting in Telluride and the Special Board meeting on June 16, <br />1998 the Board approved the following to be completed in chronological order: <br /> <br />1. The CWCB enter into a 3-party agreement with PMRCA and RMI Enviromnental <br />Services, Inc., ensuring RMI's construction and operation of a Reverse Osmosis (RO) <br />system at the PMRCA reservoir, and PMRCA's ability to make its annual loan <br />payment to the CWCB. <br /> <br />2. Disbursement of the remaining funds can continue for the project under the original <br />$206,000 contract prior to the time an amended contract is in place. <br /> <br />3. A loan increase to the PMRCA based on changes in the project for a total loan <br />amount of $258,300.00 for a term of 10 years at 3.25 percent interest. The contract to <br />include all conditions and amendments relative to delivery of a deed of trust, <br />e collateral, reserve funds, etc. as specified at the meetings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.