My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00975
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:56:28 PM
Creation date
10/4/2006 6:47:47 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/19/2001
Description
CF Section - Project De-Authorization Review Deadline Extension Recommendations
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. , Town Of Paonia <br />P.o. Box 460 <br />;' Paonia, Colorado 81428-0460 <br /> <br /> <br /> <br /> <br />Ru~alllI. RuUldt - If.,.,. <br /> <br />October 29, 2001 <br /> <br />(:)'ll'G 'li~.:,\"\'i <br />Rt' <br />~8f;9 1 2001 <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />Attn: Mike SerIet <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br /> <br />,., - ",,,}~"-';' <br />ColoradO Water ~ ,'~if:~~' .,;<1.,., <br />"~;l~xMQ WM",'~ . <br /> <br />Dear Mr. Setlet: <br /> <br />We are requesting that the Town ofPaonia's $600,000 water project loan authorization in <br />lIB 95-1155 be extended for another year. Two and a half years ago, the Town <br />authorized GEl Consultants to proceed with a feasibility study for the water project. A <br />draft feasibility study was submitted in April of2000. <br /> <br />The Town has reviewed the options in the study and has decided that further analysis is <br />needed. The Town is likely to proceed with a detailed analysis of a project, which may <br />involvejoint operation of Lone Cabin Reservoir by the Lone Cabin Ditch and Reservoir <br />Company and the Town ofPaonia. The project may consist of rehabilitation of the inlet <br />and outlet ditches to and from the reservoir depending upon the results offield <br />investigations next year. <br /> <br />The schedule for completion of the feasibility study is now projected for June 2002. <br /> <br />If you need additional infonnation, please contact John Norris, Town Manager at (970) <br />527-4105; <br /> <br />~~ <br /> <br />Ronald W. Rowell <br />Mayor <br /> <br />RWR/kp <br /> <br />Office: (970) 527-4101 . 214 Grand Avenue . P.O. Box 460 . Paonia, Colorado 81428-0460 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.