My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00961
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00961
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:56:18 PM
Creation date
10/4/2006 6:47:21 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/22/2003
Description
Flood Section - Probable Maximum Precipitation Site-Specific Study for the Cherry Creek Reservoir-Study Findings and Recommendations
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'I . . <br /> <br />., . '" . <br /> <br />4' <br /> <br /> <br />DEPARTMENT OF THE ARMY <br />CORPS OF ENGINEERS. OMAHA DISTRICT <br />, 015 SOUTH 1 liTH STIUET <br />OMAH", NEBRASKA 611102-115'B <br /> <br />August 4, 2003 <br /> <br />RIl:PLV TO <br />ATTENTION OF: <br /> <br />District Engineer <br /> <br />Mr. Larry Lang <br />Colorado Water Conservation Board <br />Uepartment of Natural Resources <br />13 I 3 Sherman Street, .Room 721 <br />Denver, Colorado 80203 <br /> <br />Dear Mr. Lang: <br /> <br />This is in reply to your July 15,2003 letter regarding the Cherry Creek Probable <br />Maximum Precipitation (PMP) Technical Review (copy enclosed). <br /> <br />I appreciate the Omaha District having the opportunity to observe the Cherry <br />Creek PMP Technical Review process. The combined effons of the Colorado Water <br />Conservation Board (CWCB) and Cherry Creek PMP Advisory Committee (Working <br />Group) have clarified the issues related to the Cherry Creek PMP. <br /> <br />. <br /> <br />The Corps' response 10 the proposed requests/options provided in your letter arc. <br />as follows: <br /> <br />Request No, ] - Can the Corps use t11e A W A PMP values and tht: Corps' 1995 <br />PMF model, the Corps will compute the PMF storage pool volume and compare the <br />value to the existing reservoir space and Corps' 1995 storage volume that presently has a <br />requirement for an additional} 00,000 Acre-Foot of storage space to the existing reservoir <br />pool? <br /> <br />Response No. 1 - Yes, the Corps will perform the tas~ outlined in Request 1. <br /> <br />Request No.2 - Should the Corps not have the resources to perfonn Request No. <br />1. can the Corps provide its 1995 PMF Model to the eWeB so a non-federal PMF <br />volume determination can be. computed using the Corps procedures and A W A's PMP <br />input par'dl11eti:rrs? <br /> <br />Response No.2 - Given the Corps is committed to accomplishing your first <br />request, the second request is no longer applicable. <br /> <br />. <br /> <br />Request No.3 - Is there an opportunity to revise the Corps' dam safety <br />operational requirements regarding storage and spill schedules for the Cheny Creek Dam <br />and Reservoir? <br />
The URL can be used to link to this page
Your browser does not support the video tag.