My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00949
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:57 PM
Creation date
10/4/2006 6:46:57 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/21/2001
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />11 <br /> <br />Authorization: SB 96-153 County: Larimer- N. ofFt..CoUins <br />Water Source: Cache la Poudre Project Yield: 30,000 ac. ft. <br />Terms of Loan: $2,357,000 @4.15%for30yearsProjectType: Canal/Res. Rehabilitation <br /> <br />. In 1995 the Windsor Reservoir and Canal Company retained the services of Smith Geotechnical to <br />evaluate the current condition of their 25 miles of can~l and 6 reservoirs. Smith Geoteclmical identified <br />approximately $3,400,000 in recommended improvements,! with a proposed design and construction time frame of <br />IS-years. The projects identified consisted of the Poud1-e Valley Canal, Cobb Lake Pipeline and OutletlInlet <br />Structures, Windsor Reservoir No.8, Annex No.8 and Elder Reservoir Outlet Structure. The Poudre Valley <br />Canal and the Cobb Lake improvements have been desi~ed and constructed. The design on Annex No. 8 and <br />Windsor No.8 are cWTentIy underway. The constructibn of Elder Reservoir conuneneed in May of 2001, <br />constructed by ZaIc Dirt, from Longmont, CO. Elder Reservoir is tentatively scheduled to be completed by <br />September of 2001. . <br /> <br />Projects Un~er Design <br />i <br />I <br />1. Rvan Gulch Reservoir Company- Ryan Gulch Dam Rehabilitation <br /> <br />. <br /> <br />Authorization: SB 99-173 <br />Water Source: Big Thompson River <br />Terms of Loan: $317,500 @4.2S% for 30 years <br /> <br />County: Larimer- S. of Loveland <br />Project Yield: 64S ae.ft. <br />Project Type: Dam Rehabilitation <br /> <br />This project is the rehabilitation of the Ryan G~lch Dam which includes the construction of a new <br />spillway, lining the upstream face of the dam with a clay liner, sleeving the existing 24-inch outlet pipe, and <br />constructing a new upstream controlled inlet works. B;oyle Engineering, Inc. of Denver has completed the <br />final design plans, which has been reviewed and approve:ct by the State Engineer's Office. Bids were received <br />to construct the planned improvements, but were outside:the project budget. The Ditch Company is currently . <br />obtaining a new design engineer to redesign certain aspects of the project in an attempt to reduce the overall <br />. cost of the job. The project is currently on-hold pendin$ the outcome of the Ditch Company's redesign of the <br />reservoir. <br /> <br />Authorization: Small Project Loan <br />Water Source: South Platte River <br />Terms of Loan: $43,000 @3.75% for 20 years <br /> <br />j <br />2. People Ditch Comoanv - People Ditch Diversion Stnlcture Rehabilitation <br />i <br />i <br />!County: Logan - N .E. of Sterling <br />iProject Yield: 1,200 ac.ft. <br />'Project Type: Diversion Structure <br /> <br />The People's Ditch Company historically divertJd irrigation water from the South Platte River at an <br />existing diversion point located approximately 6 miles n~rthwest of the Town of Sterling. This existing <br />diversion structure was damaged during the flood of 199p and was entirely washed out in 1997. The proposed <br />project is to construct a new diversion structure along th~ Bravo Ditch, therefore eliminating the need for the <br />existing structure, and then construct approximately 1050 1.f. of 24" pipeline to transport the flow from the <br />Bravo Ditch back to Peoples Ditch. Bravo Ditch has agteed to allow People Ditch to convey their decree <br />flows through their ditch system and then divert it back t.o the existing People Ditch by means of the new <br />diversion structure. The project is tentatively on-hold pending resolution of some specific loan contract <br />requirements. <br /> <br />3. Summit Reservoir and Irrigation ComRany <br /> <br />Authorization: SB-97-008 <br />Water Source: Lost Canyon Creek <br />Terms of Loan: $200,OOO@3.75% for 30-years <br /> <br />i <br />I County: Montezuma - NE of Cortez <br />I Project Yield: 4,287 ac. ft. <br />ProjectJType: Reservoir and Ditch Rehab. <br /> <br />. <br /> <br />This $270,000 project is the rehabilitation of tqe Summit Reservoir Dam outlet works and the repair <br />and improvements to the Summit Reservoir and Irrj.gation Company's water collection and distribution <br />
The URL can be used to link to this page
Your browser does not support the video tag.