My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00941
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00941
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:54 PM
Creation date
10/4/2006 6:46:52 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/23/1966
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />the prcpcsed Longmcnt Reservcir were ccmpleted <br />and the results transmitted tc the Mayer of <br />Longmcnt. A general meeting was held in Fort <br />Morgan last week to acquaint the water users in <br />the Lower South Platte Water Ccnservancy Dis- <br />trict and other local interests with the results <br />cf the Narrcws Unit studies. <br /> <br />Design data on the Upper scuth Platte <br />Unit, Missouri River Basin Project, were trans- <br />mitted to the Office of the Chief Engineer, <br />Bureau cf Reclamaticn, fer preparing the pre- <br />liminary design and cost estimates fer Twc <br />Forks Dam. Geology studies were ccntinued at <br />the Two Fcrks and Turkshead Dam sites and at <br />additional sites of access roads and read re- <br />locaticns. Earthwcrk quantities are being <br />computed and ccst estimates are being prepared <br />for access reads and road relccaticns. Ccst <br />estimates are also being prepared fer rights- <br />of-way and clearing cf Two Forks Reservcir. <br />The final reservoir cperaticn study en Two <br />Forks was started. <br /> <br />All potential dam and reservcir sites on <br />the st. vrain Unit are being sized and ccsts <br />estimated for plan formulaticn. Hydrolcgic <br />studies ccncerning the stcrable surplus flows, <br />upstream exchange potentials, and projected <br />estimates of municipal and industrial water <br />requirements were completed. Flccd design data <br />to be used for estimating preliminary spillway <br />costs are being completed. <br /> <br />I <br /> <br />The Ccncluding Repcrt fer the Cache la <br />poudre Unit has been completed by cur cffice <br />and we have transmitted this tc the lccal, state <br />and federal interests. <br /> <br />In regard to the Fryingpan-Arkansas Proj- <br />ect, the contractcr fer ccnstructicn cf Ruedi <br />Dam had ccmpleted 44.5 percent cf the contract <br />with 58.8 percent of the contract time elapsed <br />as cf August 31, 1966. Zone material placements <br />were ccntinued en the dam and spillway. Gcod <br />
The URL can be used to link to this page
Your browser does not support the video tag.