My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00941
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00941
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:54 PM
Creation date
10/4/2006 6:46:52 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/23/1966
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />J~O~ <br /> <br />prcgress has been made en ccncrete placement in <br />the cutlet wcrks. Wcrk ccntinued on Ccunty <br />Road 104 relccaticn. Drilling and grouting <br />operaticns made fair prcgress during the pericd. <br /> <br />Preparaticns are being made for ccnstruc- I <br />tion of the Fryingpan River bridge. A ccntract <br />was awarded for clearing and fencing at Ruedi <br />Reservcir in August and clearing operaticns <br />were initiated late in that month. <br /> <br />On August 31, 1966, the ccntractcr for <br />the ccnstructicn of the Divide, Scuth Fork, and <br />Chapman Tunnels, Diversicn Dams, and Appurte- <br />nant structures cf the South Side Ccllecticn <br />System had ccmpleted 28.2 percent of the ccn- <br />tract with 35.4 percent of the contract time <br />elapsed. <br /> <br />As cf August 31, excavaticn cf the tunnels <br />had prcgressed as fcllcws: Divide, 6,581 feet; <br />Scuth Fcrk, 5,756 feet; Chapman. 8,362 feet. <br />Excavaticn was initiated at Chapman Tunnel inlet <br />heading late in the pericd. The Thcmasville- <br />Nast portion of Ccunty Read 104 relccation was <br />ccmpleted and work ccntinued en the Divide <br />Tunnel Inlet pcrtal access road. <br /> <br />On August 31, 1966, the ccntractcr fer <br />ccnstruction cf Sugar Leaf Dam and reads had <br />ccmpleted 32.8 percent cf the contract with <br />22.2 percent cf the contract time elapsed. <br />Ccncrete placement is essentially ccmplete fer <br />the cutlet wcrks conduit. Excavaticn cperaticns <br />ccntinued and zone placements were made en the <br />dike. Wcrk continued en ccuntY-Rcad 104 relo- <br />cation and Divi@eTunnel Outlet Pcrtal access <br />read. <br /> <br />Regarding the Upper Cclcradc River Stcr- <br />age project, en August 31, 1966, the ccntractcr <br />for ccnstructicn of the pcncha-Midway section <br />cf the Curecanti-Midway 230-kv. transmissicn <br />line had ccmpleted 27.5 percent cf the contract <br />with 25.2 percent of the contract time elapsed. <br /> <br />I <br /> <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.